BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Renovation of a medical facility in Tuscaloosa, Alabama. Completed plans call for the renovation of a medical facility.

Construction of the Bryce Hospital HVAC Controls Upgrades - Jace 7 Service Area, Ua Project Questions Regarding This Project, Please Contact Ua Project Manager Matt Bonds at 205-723-3185 or Bonds010@ua.edu. General Contractors, Prime Hvac Contractors, Controls Subcontractors and Prime Hvac Controls Contractors Are Required to Prequalify Prior to Bidding or Performing Work. Ua Hvac Master List Will Not Apply for This Project, but Waiver Requests Will Be Allowed Prequalification Submissions Must Be Received by 5:00pm Local Time September 9, 2025. Late Submittals Will Not Be Accepted. Preliminary Drawings and Specifications Are Open to Public Inspection and Will Be Available for Examination Only Starting August 29, 2025, at the University of Alabama, Office of Construction Administration Plan Room, 1115 14th Street, Ancillary Services Building, Second Floor, Tuscaloosa, Al 35401.

Bid Results

Medical

$172,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
68
Bidding Soon
598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

October 23, 2025

Project location map

To Be Determined, Tuscaloosa, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.