BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work for a bridge / tunnel in San Antonio, Texas. Conceptual plans call for site work for a bridge / tunnel.

The contractor shall provide all management, tools, equipment, and labor necessary to ensure the removal and replacement of the existing Hole 18 Golf Cart Bridge (B490) at Joint Base San Antonio (JBSA) Lackland (Site A), and the Pedestrian Bridge (B8160) at JBSA Chapman Training Annex (Site B). The replacement bridges must be structurally sound, pre-fabricated, and designed to safely accommodate pedestrians and golf carts. All work must comply with the Americans with Disabilities Act (ADA). The Method of Contractor Selection has not been determined at this Time.

Conceptual

Bridges / Tunnels

$400,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
102
Bidding Soon
2,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2026

Project location map

To Be Determined, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.