BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated November 21, 2025

Site work for a water / sewer project in Rainbow City, Alabama. Completed plans call for site work for a water / sewer project.

8" Sewer Pump Purchase and Installation The Owner reserves the right to waive any informalities or to reject any or all bids, and to award the contract to the lowest and responsible bidder. All bidders must comply with requirements of the Purchasing Law of the State of Alabama. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimate ranges from $110,000 to $130,000 The City of Attalla requests a quote for purchasing and installing a Sanitary Sewer Pump for the Lagoon Pump Station located at 4000 East Greenview Avenue, Rainbow City, AL 35906. The City strongly encourages contractors to review the site prior to submitting a quote. The quote shall include the following: Project Scope: The following items, but not limited to only these items, shall be included in the Lump Sum cost of purchasing and installing the Sanitary Sewer Pump for the Lagoon Pump Station: 1) The sanitary sewer pump shall meet or exceed the specifications of an 8" Godwin CD225 Open Diesel Engine Dri Prime Pump. 2) The pump shall be able to handle solids ofup to 3" in diameter. 3) The pump shall have the capability of producing flow rates up to 3240 GPM. 4) The pump shall be able to automatically prime to 28' ofsuction lift from dry. 5) The pump shall have automatic or manual start/stopping capabilities. 6) The pump shall be trailer mounted with 100 gallon Fuel Tank mounted on trailer as well. 7) The pump shall be power by a John Deere FT4 Diesel Engine (or equal). 8) The pump assembly shall include Two Floats. 9) The contractor shall deliver and install the pump. The installation includes connecting to existing 12" HDPE pipe and installing suction side pipe and floats in to wet well of pump station. 10) Contractor shall go over operation and maintenance ofpump with City Staff as soon as the pump is working property. 11 ) The pump shall have a minimum of 2 year manufactures warranty. Please contact Jason Nicholson for any questions regarding this project. He can be reached at 256-441-9200 or by email at jnicholsoniu attallaeitv.org

Award

Water / Sewer

$105,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
54
Bidding Soon
861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2025

October 13, 2025

Project location map

4000 E Greenview Ave, Rainbow City, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.