Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a detention facility in Munising, Michigan. Completed plans call for the renovation of a detention facility.
Project has been rebid The Michigan Department of Corrections (MDOC) is requesting Phase 500, 600, and 700 Engineering/Architectural/Construction Administration Services for two (2) separate projects. The Professional Services contract will be held under contract . The projects include replacement of the warehouse cooler / freezer which includes structural repairs and roof replacements, on two buildings within the facility. Bidding Plans will be advertised under DTMB for the cooler freezer project and 472/25266.JBB for the roofing project. Detailed information on the desired scopes is listed below: PROJECT SCOPE: o Warehouse Cooler/Freezer Replacement - Phases 500, 600, and 700 - The existing cooler/freezer has been in service for 35 years and has reached its lifespan. The mechanical equipment is outdated, and replacement parts are unattainable. The facility would prefer to modify the existing cooler/freezer location to have the cooler next to the freezer and create an office area in the existing cooler area. o Roof Replacement - Phases 500, 600, and 700 - The roofs on the Spruce Housing Unit and the 300 Building are beyond their lifespan and need replacement. There is active leaking in both buildings. The current roofs are EPDM and replacement with EPDM is requested but a fleece back option may be considered if the PSC feels it is appropriate, and the agency concurs. Question Deadline 09/17/2025 at 12:00 PM ET Please do not submit online questions via online. ALL questions should be emailed to Jeff Barsch at barschj@michigan.gov The agency requests the design of this project begin as soon as possible upon contract award with construction anticipated in spring/summer of 2026. Scope - Remove and replace the existing walk-in cooler freezer combination unit with a new walk-in cooler and separate walkin freezer. Provide new LED lighting in units. Remove and replace the existing cooler & freezer remote refrigeration, located outside, with new remote refrigeration components. Provide a new roof over the refrigeration components
Post-Bid
Jails / Prisons
$7,800.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2026
June 22, 2026
N6141 Industrial Park Dr, Munising, MI
Related To This Project
Munising, MI
Bid Date: Oct 03 2025
Munising, MI
Bid Date: Sep 25 2025
Munising, MI
Bid Date: Oct 06 2025
Munising, MI
--
Munising, MI
Bid Date: May 18 2026
Munising, MI
--
Munising, MI
--
Munising, MI
Bid Date: Aug 29 2025
Munising, MI
Bid Date: Aug 29 2025
Munising, MI
Bid Date: Jun 25 2025
Munising, MI
Bid Date: Jun 16 2025
Munising, MI
Bid Date: Jul 11 2025
Munising, MI
Bid Date: Jun 06 2025
Munising, MI
Bid Date: Mar 28 2025
Munising, MI
Bid Date: Apr 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
