BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 11, 2025 at 8:00 PM

Updated October 12, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Ellerbe, North Carolina. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

County: Richmond Description: Replacement of Bridge No. 91 over Colemans Creek on SR 1148 (Grassy Island Road) The date of availability for this contract is the date the Contractor begins work but not before November 1, 2025, or later than February 1, 2026. The completion date for this contract is one hundred eighty (180) days after completing Intermediate Contract Time Number 1. For questions, please contact me at (910) 773-8034 or cgbrown1@ncdot.gov. NCDOT - Bridge No. 91 on SR 1148 Grassy Island Road Questions should be emailed 7 calendar days prior to the bid opening to Chad Brown at cgbrown1@ncdot.gov Contact with any other NCDOT personnel concerning this project isstrictly prohibited, unless otherwise noted, and may result in bids being considered non-responsive. Question Deadline 09/16/2025

Award

Bridges / Tunnels

$652,344.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

75

6

7

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
197
Bidding Soon
2,424
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

November 1, 2025

Project location map

Grassy Island Rd, Ellerbe, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.