Published September 2, 2025 at 8:00 PM
Updated September 17, 2025
Site work for a civil project in Seattle, Washington. Completed plans call for site work for a water / sewer project.
Kiewit Infrastructure West Co (Kiewit) has been selected as the General Contractor/Construction Manager (GC/CM) for the Elliott West Wet Weather Treatment Station (EWWTS) project performed for King County Wastewater Treatment Division. The EWWTS project includes the procurement and installment of an ACTIFLO Ballasted Sedimentation System for suspended solids removal at the Elliott West Wet Weather Treatment Plant, among a number of other improvements. The preconstruction of the overall project commences in July 2024 and is planned to end in Q4 of 2027. The overall project also includes: Upgrades to the screening facility, installation of new pumps, added Ultraviolet Disinfection equipment, miscellaneous electrical upgrades, and modifications to the operation of the Mercer Street tunnel. The GC/CM intends to select the Vendor/Subcontractor to assist in preconstruction services for the new, complete ACTIFLO Ballasted Sedimentation System utilizing the alternative selection process in accordance with the provisions in RCW 39.10.385. The reason for utilizing this alternative selection include, but are not limited to, the following: Preconstruction involvement allows KIWC the ability to mitigate risk from supply chain issues and specialized components that must be identified to complete design Improvement of cost and schedule certainty by allowing the design to proceed without multiple iterations for different design components Procurement of materials are based on best fit and function rather than solely basing the selection on the lowest priced responsive bid received Selected vendor to provide valuable input throughout the design phases of the Project. Vendor will be able to work with design team and communicate important information through each iteration of the overall design. Questions can be directed to Christopher Walsh or Jack Hanley (Jack.Hanley@kiewit.com) Written comments received prior to the hearing will be addressed at said public hearing. Protests related to the selection decision, or the use of the alternative selection process must be submitted to King County, Attn: Rowena.Johnson@kingcounty.gov and Kiewit, Attn: Eric.Johanson@kiewit.com. Protests regarding the selection decision must be submitted within four (4) business days of the final determination of selected proposer. Protests regarding the decision to use the alternative selection process must be in writing and submitted within seven (7) calendar days of the final determination. Protest letters should include at a minimum; name and contact information for protestor and the basis of the protest.
Post-Bid
Water / Sewer
$300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2025
October 16, 2025
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
--
Seattle, WA
Bid Date: Oct 15 2025
Seattle, WA
Bid Date: Sep 23 2025
Seattle, WA
Bid Date: Sep 19 2025
Seattle, WA
Bid Date: Oct 01 2025
Seattle, WA
Bid Date: Oct 29 2025
Seattle, WA
Bid Date: Sep 17 2025
Seattle, WA
Bid Date: Oct 29 2025
Seattle, WA
Bid Date: Oct 28 2025
Seattle, WA
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.