Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 30, 2025 at 8:00 PM
Updated December 4, 2025
Renovation of a water / sewer project in Seattle, Washington. Completed plans call for the renovation of a water / sewer project.
Question Deadline date changed from 09/19/2025 to 10/08/2025 as per Addendum 2 Response to Questions October 15, 2025, 11:59pm Interviews if Conducted (estimated) Week of October 27th, 2025. Announcement of Successful Proposer(s) November 18, 2025 Anticipated Negotiation Schedule November 18, 2025 Contract Execution December 5, 2025 Task 1 - Investigation and site characterization Objective: To develop an understanding of current site conditions and project risks based on available information and new sampling. Subtask 1.1 Documentation review - Consultant will gather and review existing data, including photographs, reports, data and drawings provided by Seattle City Light, historical site data from public sources such as aerial photography, Light Detection and Ranging (LIDAR), available survey and topographic data, and soil and geologic mapping. Identify gaps and additional information needs. Subtask 1.2 Site visits & sampling - Consultant will complete site visits as needed to perform sampling and any other data collection necessary to characterize contaminants of concern including determining approximate extent and quantity of contaminated materials. Including but not limited to water, exposed surfaces, and tunnel floor. The consultant will identify a plan for characterization of the site, including whether the consultant plans to use divers, Remote Operated Vehicles (ROV), or temporarily dewater the tunnel. Associated safety plans will be required. Temporary dewatering methods must be approved by the Department of Ecology. Task 2 - Options analysis for the tunnel dewatering and environmental cleanup Objective: Research and recommend potential project approaches that will meet the objectives of the project including: o Remediate or mitigate contaminants from the water and tunnel including dissolved, suspended, and solidified contaminants without contaminating Diablo Lake. This requires a long-term solution. o Dewater the tunnel for short-term investigation/mitigation activities and for long-term operations and maintenance activities using a method(s) that can be approved by Department of Ecology. Complete appropriate sampling and validation of any water treatment systems planned for temporary or permanent dewatering systems in accordance with Department of Ecology requirements. o Evaluate existing system and design temporary and permanent dewatering systems that will maintain the dewatered state long-term while meeting water quality standards with similar capacity and a high degree of reliability. The permanent system will be designed to City Light's specifications, which will include but is not limited to operation indication visible at the powerhouse, run-time logs, tunnel water float switch/level sensor, and flow meter, which can input to City Light's Supervisory Control and Data Acquisition (SCADA) system. o Leave the site in a state that meets workplace standards for entry with regard to contaminants present and prevents migration of contaminants out of the tunnel.
Post-Bid
Water / Sewer
$750,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
January 1, 2026
To Be Determined, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Sep 17 2025
Seattle, WA
Bid Date: Sep 16 2025
Seattle, WA
--
Seattle, WA
Bid Date: Oct 28 2025
Seattle, WA
--
Seattle, WA
Bid Date: Sep 02 2025
Seattle, WA
Bid Date: Sep 03 2025
Seattle, WA
Bid Date: Sep 05 2025
Seattle, WA
Bid Date: Sep 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
