BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a sidewalk / parking lot in Brentwood, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot.

The Borough of Brentwood, Allegheny County, Pennsylvania, is inviting firms to submit a proposal for a one-time contract to perform certain professional services (consulting) work for the Borough of Brentwood involving the preparation of conceptual and eventually final architectural/engineering design documents associated with the Brentwood Park Field No. 4 ADA Improvements. One firm will be selected to provide design architectural/engineering services for the project. The Proposals must be made to the Brentwood Borough, Allegheny County, Pennsylvania, and shall remain firm for a period of sixty (60) days. The Owner reserves the right to reject any or all Proposals, or any part thereof, for any reason, and also reserves the right to waive any informality therein. The method of Contractor Selection has not been Determined at this time. Question Deadline 09/25/2025 at 2:00 PM ET: Online Portal. Event Pre-Bid Meeting Notes : No other tours will be given other than the one associated with the Mandatory Pre-Submission Conference. There are four Phases in the Base Bid. All Phases shall include the following: A. Phase I - Pre-Design: Program Development and Documentation Review 1. Prepare a more detailed project schedule from the preliminary project schedule required for this RFP that identifies the necessary major tasks and/or benchmarks during the design process. Estimate the time required to accomplish each major task, including those associated with design review. The project schedule shall be updated throughout the design process. 2. Prepare a companion document that identifies potential risk issues that could negatively impact the project budget or schedule. The successful Proposer shall help develop strategies to mitigate these risk impacts. The risk assessment document shall be updated throughout the design and construction process. 3. Participate in a project kick-off meeting with the Project Team to formulate a design statement in which major project goals and the means of implementation are identified. The Project Team is at a minimum the A/E design team, the Borough Manager, three (3) members of Borough Council. Other Borough staff may also be included as members of the Project Team, as necessary.4. Study the area and propose some design options to Project Team. 5. Coordination with adjacent property owners as needed. 6. Investigate the utility owner, locations and status within the area

Award

Sidewalks / Parking Lot

$81,075.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
10
Bidding Soon
1,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

October 21, 2025

Project location map

118 Park Dr, Brentwood, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.