Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2025 at 8:00 PM
Updated October 23, 2025
Site work for a water / sewer project in Chariton, Iowa. Completed plans call for site work for a water / sewer project.
Iowa State University of Science and Technology (ISU) is soliciting information from qualified contractors to provide supply all equipment, labor, fuel, and supplies to install farm field tile for drainage at the McNay Research Farm located at 48031 200th Ave, Chariton, IA. Contractors should read all materials carefully and note the due date. Question Cut Off Date 9/2/2025 04:00:00 PM (CT) Contractors must submit all questions in the "Questions" tab related to this bid opportunity. Contact Information Lucas Schau Address Warren Madden Building 2221 Wanda Daley Drive Ames, IA 50011-1004 USA Phone 515 (294) 8853 Fax Email lschau@iastate.edu Scope of the Contract Operator(s) shall supply all equipment, labor, fuel, and supplies to install farm field tile for drainage at the McNay Memorial Research Farm located near 48031 200th Ave, Chariton, IA. Equipment must be of acceptable size and design in the opinion of the Owner to accomplish operations in a reasonable and efficient time interval. The selected operator will be responsible for the work listed below. The Operator will be paid for work once completed. Payment will be based on the unit cost stated on the Bid Lines Tab. Operator(s) shall supply all equipment, labor, fuel, and supplies to complete custom operations at the Iowa State University McNay Memorial Research Farm. Materials: All materials shall be new and installed in accordance with the Scope of Work, figures or drawings, and the procedures established by the material manufacturer. Installation: Provide a Contractor's 1-year guarantee against defects in materials and workmanship. 2. Summary of Work: Work shall include the installation of plastic drainage pipe to drain approximately 55 acres of farmland. The work will include drainage laterals, sub-main tiles, and main tiles. Preliminary tile design as shown under the Attachments Tab. The successful bidder shall assist with the final tile design. The timeline is approximately October 15, 2025, or when the field is harvested, through March 30, 2026. ISU would prefer to have completed in the fall of 2025, if possible.
Award
Water / Sewer
$84,896.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2025
October 15, 2025
48031 200 Ave, Chariton, IA
Related To This Project
Chariton, IA
--
Chariton, IA
Bid Date: Sep 18 2025
Chariton, IA
Bid Date: Jul 09 2025
Chariton, IA
--
Chariton, IA
Bid Date: Mar 27 2025
Chariton, IA
Bid Date: Mar 12 2025
Chariton, IA
Bid Date: Feb 27 2025
Chariton, IA
Bid Date: Jan 21 2025
Chariton, IA
--
Chariton, IA
--
Chariton, IA
--
Chariton, IA
Bid Date: Aug 28 2024
Chariton, IA
--
Chariton, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
