Site work and paving for a mixed-use development in Chariton, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

17728.20.IAM The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of the improvements, which consist of three independent sections of work. Section 1 includes: 1. Installation of approximately 3,400 linear feet of new 12" diameter water main, fittings, valves, hydrants, services, and related appurtenances; 2. Installation of approximately 120 linear feet of new 4", 6", 8", and 10" diameter water mains, fittings, valves, hydrants, services, and related appurtenances; 3. Installation of approximately 125 linear feet of new 12" diameter water main installed in an 18" diameter casing pipe using trenchless construction methods; 4. Approximately 580 square yards of PCC and HMA pavement removal and replacement; 5. Approximately 520 square yards of driveway removal and replacement; 6. Reconstruction of approximately 525 square yards of sidewalk and ADA-compliant curb ramps with detectable warning panels; 7. Site dewatering as required for construction, erosion control, site restoration and seeding, field testing; and 8. All other work as required by the contract documents. Section 2 includes: 1. Installation of approximately 3,600 linear feet of new 12" diameter water main, fittings, valves, hydrants, services and related appurtenances; 2. Installation of approximately 900 linear feet of new 8" diameter water main, fittings, valves, hydrants, services and related appurtenances; 3. Installation of approximately 300 linear feet of new 4" and 6" diameter water mains, fittings, valves, hydrants, services, and related appurtenances; 4. Approximately 630 square yards of PCC and HMA pavement removal and replacement; 5. Approximately 225 square yards of driveway removal and replacement; 6. Reconstruction of approximately 70 square yards of sidewalk and ADA-compliant curb ramps with detectable warning panels; 7. Site dewatering as required for construction, erosion control, site restoration and seeding, field testing; 8. All other work as required by the contract documents. Section 3 includes: 1. Installation of approximately 480 linear feet of new 12" diameter water main, fittings, valves, hydrants, services and related appurtenances; 2. Installation of approximately 1,020 linear feet of new 8" diameter water main, fittings, valves, hydrants, services and related appurtenances; 3. Installation of approximately 40 linear feet of new 4" and 10" diameter water mains, fittings, valves, hydrants, services, and related appurtenances; 4. Approximately 1,610 square yards of PCC and HMA pavement removal and replacement; 5. Approximately 150 square yards of driveway removal and replacement; 6. Reconstruction of approximately 130 square yards of sidewalk and ADA-compliant curb ramps with detectable warning panels; 7. Site dewatering as required for construction, erosion control, site restoration and seeding, field testing; 8. All other work as required by the contract documents. Site Directions: Various locations in Chariton, Iowa. Section 1 is generally along N 8th Street, ranging from Ashland Avenue south to Roland Avenue, Roland Avenue east to N 6th Street, and N 6th Street south. Section 2 generally begins at Lucas Avenue and N 16th Street, ranging north to Ilion Avenue, east to 1020 Ilion Avenue, south to Lucas Avenue and N 11th Street, and south to Ashland Avenue. Section 3 consists of a portion parallel to the BNSF Railroad between Lucas Avenue and Ashland Avenue; a portion generally beginning at N 11th Street and Auburn Avenue, east along Auburn Avenue to 1017 Auburn Avenue, then south along an alleyway to approximately 217 N Main Street; and lastly, a portion beginning at Chariton City Hall, east through alleyways to approximately 918 Court Avenue. Est. Completion Date: Oct. 1, 2022 The tabulated results of the bid opening will be considered by the Chariton Municipal Waterworks Board of Trustees at their meeting in the Board Room at Chariton Municipal Waterworks, 101 Albia Road, Chariton, Iowa, 50049 on Monday, October 11, 2021 at 5:30 P.M. at which time the Board may take action on the proposals submitted or at such time as may then be fixed. Bid Results Section 1 : N 8th Street to Roland Avenue - MB Construction LLC - $1217775 Section 2 : Ilion Avenue - MB Construction LLC - $1254353 Section 3 : Central Business District - MB Construction LLC - $1013925

Award

Sidewalks / Parking Lot

$3,486,053.00

Public - City

Paving, Site Work

90

12

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
0
Bidding Soon
418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2021

November 5, 2021

Project location map

Multiple Locations, Chariton, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.