Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 29, 2025 at 8:00 PM
Updated March 13, 2026
Renovation of a power facility in Doniphan, Nebraska. Completed plans call for the renovation of a power facility.
Uninterruptible Power Supply Installation (Doniphan Control Center) Nebraska Public Power District (DISTRICT) intends to enter into a Contract for labor and miscellaneous tool and equipment to install two (2) new Uninterruptible Power Supply (UPS) systems at the DISTRICT'S Doniphan Contral Center in Doniphan, Nebraska Contact for questions: Mindy Evans, Senior Procurement Specialist Phone: (402) 563-5438 E-mail: maevans@nppd.com Pre-Bid Meeting: It is the Bidder's responsibility, while participating in the pre-bid meeting, to ask any questions necessary to understand the requirements of the Contract so the Bidder can submit a bid that is complete and according to the specifications. If you plan to participate, email Sarah Hopwood at sjhopwo@nppd.com and Melinda Evans, maevans@nppd.com with the names of those representatives planning to participate in this pre-bid and the company they represent no later than August 27, 2025. The CONTRACTOR shall provide all labor and miscellaneous tools and equipment to install two (2) new Uninterruptible Power Supply (UPS) systems at the DISTRICT'S Doniphan Contrai Center in Doniphan, Nebraska in accordance with the Contract Documents. The new UPS systems will be manufactured by Eaton Corporation and shall consist of two (2) fully rated, scalable 100/150 kVA UPSs set up in a 2 + 2 configuration, with maintenance bypass breaker cabinet and dual outputs, which will feed two (2) 225-amp static switches. Each static switch shall accept two (2) inputs, one (1) from each of the two (2) UPS units, and have a single output. Input and output voltage shall be 480-volt, threephase, four-wire. All work under Division 26 shall be completed in compliance with all adopted codes including NEC, State codes, and local codes.
Award
Power Plant
$25,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
October 15, 2025
2060 W Platte River Dr, Doniphan, NE
Related To This Project
Doniphan, NE
Bid Date: Oct 31 2025
Doniphan, NE
Bid Date: Nov 19 2026
Doniphan, NE
Bid Date: Jun 26 2025
Doniphan, NE
Bid Date: Jun 12 2025
Doniphan, NE
Bid Date: Aug 06 2024
Doniphan, NE
Bid Date: Jan 18 2022
Doniphan, NE
Bid Date: May 23 2023
Doniphan, NE
Bid Date: Aug 04 2022
Doniphan, NE
Bid Date: Nov 22 2022
Lincoln, NE
Bid Date: Sep 25 2025
Omaha, NE
Bid Date: Sep 17 2025
Concord, NE
Bid Date: Sep 08 2025
Genoa, NE
Bid Date: Sep 12 2025
Omaha, NE
Bid Date: Sep 03 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed