Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 3, 2025
Site work and paving for a civil project in Charleston, West Virginia. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
These twin structures carry Interstate 64 (I-64) EB (BARS # 45A068) & WB (BARS #45A069) over County Route (CR) 4 (Lick Creek Road). Constructed in 1985, each of the existing bridges have an overall length of approximately 156.0 feet and a roadway width of approximately 40.8 feet. This project shall consist of the preparation of contract plans, traffic engineering services, and related documents for superstructure replacements at their existing locations, while maintaining traffic via staged construction. A Design Study will not be a part of these services. The Consultant shall reference DD-681 and develop the appropriate Traffic Management Plan, which will also be required. The Consultant shall reference DD-506 and use pollution prevention and discharge reduction methods in the design. As part of WVDOH's desire to facilitate safety discussions for transportation projects, the Consultant shall complete and submit to the Traffic Engineering Division, the Safety Assessment for Every Roadway (SAFER) Form for the project as part of the Preliminary Field Review and Final Office Review. NEPA Documentation will be handled In-House by the Technical Support Division. Post Design Services, if required, will be by separate Agreement. Method of payment shall be Cost Plus Fixed Fee. A single assignment will be made for this project. It is the policy of the West Virginia Department of Transportation, Division of Highways, that Disadvantaged and Women-owned Business Enterprises shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with Federal funds. This requirement will be waived for the selected firm or any subconsultant when its portion of the fee for the project is less than Five Hundred Thousand Dollars ($500,000.00). In such instances, a company computed overhead rate may be utilized. The method of Contractor Selection has not been Determined at this time.
Conceptual
Bridges / Tunnels
$400,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2026
Multiple Locations, Charleston, WV
Related To This Project
Charleston, WV
Bid Date: Sep 24 2025
Charleston, WV
Bid Date: Sep 08 2025
Charleston, WV
Bid Date: Sep 10 2025
Charleston, WV
Bid Date: Sep 30 2025
Charleston, WV
Bid Date: Sep 17 2025
Charleston, WV
Bid Date: Nov 18 2025
Charleston, WV
Bid Date: Sep 23 2025
Charleston, WV
Bid Date: Sep 23 2025
Charleston, WV
--
Charleston, WV
Bid Date: Sep 09 2025
Charleston, WV
--
Charleston, WV
Bid Date: Oct 06 2025
Charleston, WV
Bid Date: Sep 09 2025
Charleston, WV
--
Charleston, WV
Bid Date: Oct 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
