BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work and paving for a civil project in Fort Worth, Texas. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Questions Due Date: Oct 9th 2025, 5:00 PM CDT GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: o ~12,500 LF of 54" Water Line by Open Cut (AWWA C200 or AWWA C303) o ~407 LF of 78" Steel Casing Pipe or Tunnel Liner Plate with 54" Carrier Pipe by other than Open Cut o ~266 LF of 78" Steel Casing Pipe with 54" Carrier Pipe by Open Cut o ~160 LF of 16" Water Line by Open Cut o ~1,175 LF of 8" Water Line by Open Cut o ~40 LF of 21" RCP Storm Drain o ~195 LF of 24" RCP Storm Drain o ~15 LF of 42" RCP Storm Drain o ~20 LF of 48" RCP Storm Drain o ~41,265 SY of Asphalt Pavement Repair o ~880 SY of 8" Concrete Pavement Repair Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre-qualified by the City at the time of bid opening. City reserves the right to waive irregularities and to accept or reject any or all bids. City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. Intent to Bid Due Date: Oct 9th 2025, 12:00 PM CDT

Award

Water / Sewer

$25,317,617.00

Public - City

Paving, Site Work

132

16

103

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
471
Active Projects
195
Bidding Soon
4,449
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 15, 2025

Project location map

Multiple Locations, Fort Worth, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.