Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2026 at 7:00 PM
Updated January 22, 2026
Site work for a road / highway in Pasadena, California. Completed plans call for site work for a road / highway.
The ITS Projects and Traffic Flow Improvements Project within affected SR-710 Corridors includes the design and implementation of ITS assets along the selected signalized intersections and integration of these assets into the DOT multi-modal transportation network. Integration will feature point to point connectivity through fiber optics for communications at some locations. The installation of hardware consists of, but not limited to, upgrading 18 type 337 cabinets to type 332 cabinets, traffic controllers, audible pedestrian push buttons, vehicle detection equipment technology, conduits, conductors, pull boxes, and miscellaneous appurtenant work for up to 28 signalized intersections along Orange Grove Boulevard, Colorado Boulevard, Green Street, and Holly Street. Background The proposed ITS project will provide signal equipment upgrades to up to 28 signalized intersections within the City of Pasadena. These signals are centrally located near the central business district. The signals along Orange Grove Boulevard, Colorado Boulevard, Green Street, and Holly Street are east-west corridors south of the I-210 Freeway which serves as connectors to the major north-south corridors of Orange Grove Boulevard and Fair Oaks Avenue and the I-210 on-and-off ramps at Lake Avenue, Hill Avenue, Allen Avenue, and Sierra Madre Boulevard. Question Submission Deadline:December 2, 2025, 2:00pm *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$1,507,774.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
February 9, 2026
CA-710, Pasadena, CA
Related To This Project
Pasadena, CA
Bid Date: Sep 26 2025
Pasadena, CA
Bid Date: Sep 24 2025
Pasadena, CA
--
Pasadena, CA
Bid Date: Oct 07 2025
Pasadena, CA
--
Pasadena, CA
--
Pasadena, CA
Bid Date: Oct 23 2025
Pasadena, CA
Bid Date: Oct 10 2025
Pasadena, CA
Bid Date: Oct 02 2025
Pasadena, CA
--
Pasadena, CA
--
Pasadena, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
