BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated September 23, 2025

Site work and paving for a road / highway in Everett, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Full Depth Road surfacing for 2025. MassDot Prequalification is required. M.G.L. c. 30, 39M is applicable. In general, the work under this contract includes full-depth roadway reclamation; placement of hot mix asphalt pavement; removal and resetting of existing granite curbing; installation of new granite curbing; construction of cement concrete sidewalks and ADA/AABcompliant pedestrian ramps; installation ofsubsurface structures and associated piping; installation of new rims, grates, and frames; removal and resetting of existing rims, grates, and frames; construction of tree planting pits; installation of traffic signage; and all related roadway and site improvement work at various locations. Work to be done under this contract shall be completed within the 2025 construction season. Work to be done under this contract shall be completed concurrently, and in coordination with, existing and ongoing City roadway and infrastructure improvement contracts. Any bidder currently engaged in a contract with the City of Everett shall not neglect work in one contract in favor of another. The successful Bidder shall be fully able to staff both this contract and any ongoing contracts with the City of Everett with the appropriate amount of superintendence and working staff needed to complete all work expeditiously and within the stipulated contract periods. Contract extensions of time beyond December 31, 2025 shall be granted at the sole discretion of the City of Everett. There will be no pre-bid meeting for this project. SCOPE OF WORK AND LOCATION OF PROJECT The street and sidewalk locations to be considered for rehabilitation will be determined by the City after award of the contract. The City of Everett has the right to add to or remove any streets without cause, or change the method of rehabilitation as may be required. The general characteristics and details of the work to be performed under this contract are specified in the contract specifications provided herein. Drawings, specifications, or other requirements, or responses to written questions of bidders submitted during the bidding period may be furnished by written addendum to the bid and contract documents from time to time during the bidding period by the City or its Engineer and shall then become a part of the Contract Documents. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the work and as specified herein Question Deadline 09/11/2025 Every request for such interpretation should be in writing addressed to City of Everett Purchasing Department, or emailed to Kiara Freeman at kiara.freeman@ci.everett.ma.us to be given consideration must be received at least seven days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, when issued, will be emailed to all prospective bidders (at the respective aThe Bidder shall make positive efforts to achieve the following within project contracts: (1) a minority employee work force hour goal of 10.00 percent, (2) a woman employee work force hour goal of 6.90 percent, (3) a Minority-owned Business Enterprise(s) participation goal of 7.24 percent, and (4) a Woman-owned Business Enterprise(s) participation goal of 3.60 percent

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
145
Bidding Soon
3,891
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2025

October 20, 2025

Project location map

Multiple Locations, Everett, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.