BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work for a playground / park / athletic field in Welch, West Virginia. Completed plans call for site work for a playground / park / athletic field.

River View High School Baseball Field Repairs The Project includes the following Work: Removal of flood sediment/debris at the existing baseball field, removal and replacement of 4" of material topsoil, seeding and mulching of all disturbed areas, removal and installation of perimeter chain link fence, base anchors, gabion baskets for bank stabilization, and other misc. related items. Question Deadline 12/18/2025 The McDowell County Board of Education reserves the right to reject any and all bids. A. The Owner has obtained registration under the West Virginia Department of Environmental Protection (WVDEP), Division of Water and Waste Management Construction Stormwater General Permit. B. Contractor responsibilities shall range from, and not be limited to, implementing and maintaining all Best Management Practices (BMP) necessary to protect roads, streams, ditches, lands, etc. within and outside of Project area against the transfer of water borne sediment originating within the Project area due to work conditions, acts of God, etc. Any violation shall be the monetary responsibility of the Contractor. C. In general, the Work to be done includes measures necessary to control erosion and sediment within the construction area to the acceptance of the WV DEP Division of Water and Waste Management, and the U. S. Army Corps of Engineers. The Contractor is responsible for the implementation of the erosion and sediment control plan, as initially set forth. All erosion and sediment control BMPs shall be constructed in accordance with the Erosion and Sediment Control details provided in the Contract Drawings and as stipulated herein. 1. A stone stabilized pad located at points of vehicular ingress and egress on a construction Site. 2. A stone stabilization pad location for materials, equipment, and offices on a construction Project. 1. Class I aggregate, as defined in table 704.1 of the WVDOH Standard Specifications, material shall meet the requirements of WVDOH Section 704 (technical reference only). 2. Earth tone aggregate shall be supplied by the Owner and stockpiled on-site per the Logistic plan. 3. Install rip-rap stone as shown on the construction Drawings and other areas directed by the Engineer.

Bid Results

Playgrounds / Parks / Athletic Fields

$639,810.00

Public - County

Site Work

6

8

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
81
Bidding Soon
768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2026

February 9, 2026

Project location map

512 Mountaineer Hwy, Welch, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.