Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work and new construction of a water / sewer project in Grafton, Massachusetts. Completed plans call for the construction of a 4,500-square-foot, one-story above grade water / sewer project; and for site work for a water / sewer project.

Question Deadline 09/26/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond. Prospective Bidders must be registered users of the website to submit questions regarding the project. In order to receive consideration, questions must be received by Engineer at least five days prior to the date fixed for the opening of Bids. The work consists of the following major items 1. Construction of a new 1.62 MGD Water Treatment Plant (WTP) housing two PFAS media contactors, backwash supply and finished water pumps, a finished water clearwell, and a chlorine gas chemical feed system at the East Street WTP site located at 77 Rear Snow Road. The new PFAS WTP building will be an approximately 4,500 square foot concrete masonry building inclusive of process, HVAC, plumbing, fire protection, electrical, instrumentation, and SCADA integration. 2. Installation of a new propane generator and buried propane tanks. 3. Modified and new site piping, site work for drainage, water, sewer, gas, electrical, and all site/civil surface finishes at the site. Masonry; Misc. Metals & Ornamental Iron, Waterproofing, Damp-proofing & Caulking; Roofing & Flashing; Metal Windows; Painting; Fire Protection; Plumbing; HVAC; & Electrical. Construction of a 1.62 MGD PFAS Water Treatment Plant (WTP) at the site of the existing East Street Greensand Filtration Plant at 77 Rear Snow Rd. in Grafton, MA. A new 4,500 SF concrete masonry building will be constructed. The work also includes, but is not limited to, site work, HVAC, plumbing, fire protection, electrical, instrumentation, and SCADA. The project shall be substantially completed within 670 calendar days of the Noted to Proceed. Construction is expected to begin in the Winter 2025/2026. Custom bid result Masonry Filed Giliberto & Sons, LLC - $588,518 Miscellaneous Metals Waterline Industries Corp. - $117,677 Roofing & Flashing Waterline Industries Corp. -$137,677 Waterproofing, Damp-proofing Armani Restoration, Inc. - $107,725. Metal Windows Lizotte Glass, Inc. - $54,373 Painting SOEP Painting Corporation - $142,000 Plumbing LaPan Mechanical - $211,750 HVAC CAM HVAC & Construction Inc - $233,842 Fire Protection Rustic Fire Protection, Inc - $67,000 Electrical Jupiter Electric, Inc. - $1,387,870

Bid Results

Water / Sewer

$3,048,432.00

Public - City

New Construction, Site Work

117

37

77

6

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
10
Bidding Soon
2,813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

December 1, 2025

Project location map

77 Rear Snow Road, Grafton, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.