Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Renovation of a stadium in Southgate, Michigan. Completed plans call for the renovation of a stadium.
Reference Number 0000397336 Contractor Services for Stadium Electrical and Lighting Improvements at Southgate Community Schools - Anderson High School. Project Description: The RFP consists of electrical and lighting contractor services at Southgate Anderson High School located in Southgate, MI. The scope of work is detailed in attachment A2. The Owner desires to commence construction on or before November 1st, 2025 and be substantially complete by March 1st, 2026. Scope of work includes providing labor, supervision, materials, permits (if required), tools and equipment necessary to perform the electrical demolition and installation work as described in this RFP. The Scope of Services are detailed and described in the Contract Documents included in Attachment A.2. Project Scope: The site of this work will take place at Southgate Anderson High School. Provide labor, materials, tools and equipment required to perform the following demolition, electrical and lighting scope as noted below. The scope of this work includes, but is not limited to, supplying labor and materials necessary to install forty-four (44) light fixtures aimed towards the football stadium and, and four (4) security fixtures aimed towards baseball/softball fields along with all lighting wiring connections required and electrical connections to the building. Lighting must maintain high school required IES sports lighting standards if alternate number of fixtures are proposed. Existing poles will be used but new arms are to be supplied and installed for all lights. The lighting specified in the bid drawings should be used as the base design, however the district will review any acceptable alternate lighting packages. Alternates should be submitted to the district for review and approval prior to the bid submission deadline. All lighting controls shall be ASHRAE 90.1-2013 compliant. Site restoration should also be included in the contractor's proposal along with any debris/material removal necessary to complete the work. Firms to include installation schedule along with any applicable lead times. o Reuse of existing poles - stadium lighting to receive new galvanized arms, fixtures, and stainless steel hardware. o Software - Synapse or comparable software to control lights included. Specs provided in attachment A.3. o Site restoration to include topsoil and hydroseeding of any disturbed area in the spring following construction. Hydroseeding to take place during the spring to ensure proper growth. o Must protect track and turf field, existing concrete, fencings, etc. o 25-year warranty on fixtures, controls, and data boxes. o Controller wired into press box and be fully functional from press box. If wireless is proposed in your bid, then annual contract to maintain usability should be included for lifetime of product. o All controls must be included in bid. o Basis of design to be 480 volts. o Safety zone/lift plan must be predetermined prior to installing fixtures. o Michigan based service provider to be proposed. o Licensed to performed work in the state of Michigan. o DTE rebates to be factored into price by contractor o All rental or installation materials to be included in bid. o 16 hours of training to be included in proposal. o All permitting and fees to be included. Contractor to to be responsible for producing drawings and submitting/pulling all required electrical permitting and inspections. o Photometrics must be submitted in proposal at time of bid. SOUTHGATE COMMUNITY SCHOOLS ANDERSON STADIUM LIGHTING AND ELECTRICAL RFP REQUEST FOR PROPOSAL (RFP) -CONTRACTOR SERVICES A.2 SCOPE OF SERVICES September 2, 2025 2 o Project to be completed following the 2025 football season (November 1st pending playoffs) and be completed prior to June 1st, 2026. Alternate 1 o Contractor to provide pricing for RGB lighting. This includes any additional controls, software, additional arms, installation and materials. Alternate 1 o Contractor to provide pricing for RGB lighting. This includes any additional controls, software, additional arms, installation and materials. All lighting for the parking lot and drive should be controlled and wired through the district Building Management System. Lighting on the tennis courts should have separate on and off controls via switches or an app to control on and off. All light poles and bollards are to be square and not round in style to match existing poles around the campus. Electrical box/rough-in for future power accommodation is also included in the project and is noted in the drawings. Occupancy sensor for parking lot lights and driveway lights is required. The drawings provided in attachment A.3 are diagrammatic and indicate the size and general arrangement of piping, wiring, equipment, etc. Exact locations and routings shall be determined in the field by contractors. Contractor will be required to pull any necessary permits required to complete this work. Bids must be delivered no later than time to Southgate Community Schools, 13940 Leroy Street, Southgate, MI. 48195, Attn: Mr. Jason Hardy, Director of Operations. Each proposal must be submitted on the forms included in the RFP and must be completed in full. Each proposal shall be sealed in an opaque envelope and marked with the name of the bidder and the name of the project. Southgate Community Schools is not liable for any delivery or postal delays. No bids will be received at any other location; all bids must be received by Southgate Community Schools at the address identified above. All proposals shall be firm for a period of sixty (60) days. Oral, telephone, fax or electronic mail bids are invalid and will not receive consideration. Question Deadline 09/08/2025 at 12:00 PM ET Questions are submitted online No, Any questions, contact Gary Kent at Plante Moran Realpoint at gary.kent@plantemoran.com. Bonding Requirements - Bid Bond 5 % The Board of Education reserves the right to accept or reject any or all bids, either in whole or in part; to award contract to other than the low bidder; to waive any irregularities and/or informalities; and in general to make awards in any manner deemed to be in the best interests of the owner.
Post-Bid
Arenas / Stadiums
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2025
November 1, 2025
15475 Leroy St, Southgate, MI
Related To This Project
Southgate, MI
Bid Date: Sep 12 2025
Southgate, MI
Bid Date: Oct 27 2025
Southgate, MI
Bid Date: Dec 10 2025
Southgate, MI
Bid Date: Dec 03 2025
Southgate, MI
Bid Date: Jul 23 2025
Southgate, MI
Bid Date: Aug 26 2025
Southgate, MI
Bid Date: Jul 11 2025
Southgate, MI
Bid Date: Jun 10 2025
Southgate, MI
--
Southgate, MI
Bid Date: May 19 2025
Southgate, MI
Bid Date: May 30 2025
Southgate, MI
Bid Date: Apr 30 2025
Southgate, MI
Bid Date: Apr 25 2025
Southgate, MI
Bid Date: Apr 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
