BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 25, 2025 at 8:00 PM

Updated September 26, 2025

Renovation of an educational facility in Phoenix, Illinois. Completed plans call for the renovation of a educational facility.

Coolidge Fine Art Center - BP11 - Theater AV Equipment All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the School Board, cashiers check, or certified check made payable to School District 151 in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured . The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which bond shall include a specific obligation of the Surety to guarantee the faithful performance of the Contractor under the Illinois Prevailing Wage Act, and shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract. The Owner reserves the right to reject any and all proposals or bids. The bidding documents, whichinclude drawings and specifications, are available to bidders electronicaly through the officeof the Architect. Acces can be obtained by calling the office of theArchitectat 708-339-3900 orby email ing to bidding@jmaarchitects.com. Once the bidder requests acces, the bidder will be sent an invitationto view the documents though Procore. The Architect has been authorized to refuse to issue plans and specifications andrelated bidding documents to any person, firm or corporation thatthe Architect considers to be unqualified. This project titled COOLIDGE MIDDLE SCHOOL FINE ARTS CENTER RENOVATION consist of the following major elements: 1. Remodeling and renovation of existing 2 nd floor space; 2. Roofing, masonry, glazing, general construction 3. New finishes 4. Mechanical, electrical, and plumbing to support new work 5. All other work indicated on the drawings and in the project manual for this project. B. All work on this project will be awarded to multiple prime contractors. Question Deadline 09/19/2025 If any person contemplating submitting a bid be in doubt as to the true meaning of any part of the drawings and specifications, said person may request an interpretation thereof the architect in writing. All such interpretations shall be issued in the form of an addendum to bidders on the part of the drawings and specifications thus affected. Written requests submitted within 48 hours of the scheduled opening of bids may not have an interpretation provided in an addendum.

Bid Results

Educational

$678,420.00

Public - City

Renovation

68

12

7

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
194
Bidding Soon
2,690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

October 1, 2025

Project location map

15500 7th Ave, Phoenix, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.