Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 6, 2025 at 8:00 PM

Updated September 11, 2025

This is a service / maintenance or supply contract in Saint Germain, Wisconsin. Contact the soliciting agency for additional information.

The Work Needs to Be Completed This Calendar Year Weather Permitting. The Bid Includes Mobilization of Your Equipment, Providing Traffic Control Including Flagging as Needed to Complete the Project, Strip Shoulders Prior to Adding Base Course Gravel, Remove, Load, Haul and Dispose Offsite of Sod, Grass, and Deleterious Material From Shoulder. Pulverize the Existing Blacktop Roadway Full Depth and Width. Grade, Shape, and Compact Pulverized Material. Furnish, Haul, Place, Rough Grade, and Compact Stone Base. Shape, Final Grade, Water, and Compact Roadway. Pave With Hot Mix Asphalt, With Widened Corners, and Six-inch Aprons on Unpaved Entrances. Saw Cut All Butt Joints, Intersections, And Private Entrances. Furnish, Hull, Place, and Compact Crushed Stone Base Course Shoulders on Edges of Roadway After Paving. Any Questions May Be Directed to Tom Stoltman by Email at Tom.stoltman@stgermainwi.gov, or by Phone at 715-542-8024 Ext 5.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
14
Bidding Soon
273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

October 10, 2025

Project location map

Lost Lake Dr, Saint Germain, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed