Published September 11, 2025 at 8:00 PM
Updated September 25, 2025
Site work for a playground / park / athletic field in Maringouin, Louisiana. Completed plans call for site work for a playground / park / athletic field.
Written offers to a Request for Proposals/Qualifications for the purpose of providing a Public-Private-Partnership for a Public-Private Agreement (as defined in IC 5-23-2)related to the potential design, constructing, operating, transferring, and developing of upgrades to Lincoln Park,pursuant to the applicable provisions of the Indiana Code, including, but not limited to, Indiana Code Section 5-23-1-1 et seq. The Board reserves the right to modify or cancel the Project(s) at any time before an operator enters into a formal agreement with the Board, including at any point during the scoping period. The Board reserves the right to reject any and all Proposals/Qualifications at its sole discretion. The Board may enter into discussions with any individual operator to clarify and assure a full understanding and responsiveness to the solicitation requirements. All correspondence and questions for this RFPQ should be directed to the Representative as follows: Mr. Jarod Logsdon, Parks and Recreation Superintendent, jlogsdon@zionsville-in.gov. All questions and requests for clarification must be submitted on or before September 18, 2025 at 5:00 p.m. local time PROJECT DESCRIPTION: The selected Operator may provide financing services, development services, design assistance, site work, labor, and materials to develop and construct the Project. Although the Board knows that it has a clear need for improvements to its Park, the scope of this Project is not yet fully determined. The final Project scope will be determined through a scoping period with the selected Operator, during which the selected Operator will be required to provide site analysis, design assistance, and construction analysis to create a final scope and a guaranteed maximum price for transfer of the Project to the Board upon completion. A conceptual rendering is provided as Exhibit A for general reference. The project is anticipated to include, • Demolition of existing site elements, including: gazebo foundation, tree stumps, and existing paver walkways. • Clearing and grubbing of existing site for new improvements. Grading to improve site drainage. • Removal and storage of existing historical and dedication monuments and signs. • Installation of new gazebo, period-appropriate site lighting, ADA-compliant widened paver walks, water feature, landscaping, irrigation, electrical work, and safety bollards. 1. A new Gazebo, pathway lighting, removal of certain walkways, installation and widening of walkways, a new fountain, and G gardens and other general upgrades to the park. The design of this project is being provided by Rundell Ernstberger Associates. Design documents will be provided as a part of the final agreement and will be based on design decisions negotiated with the Operator during the scoping process. As part of the scoping process, the selected Operator may be asked to provide multiple maximum price budgetsfor several different scope options so the Board can make an informed decision on whether to move forward with all or various portions of the Project. The project budget is estimated to be at an amount not to exceed Nine Hundred Thousand Dollars ($900,000.00). The Board anticipates using cash reserves for funding. It is anticipated upon completion of the scoping period that the Board will hold a public hearing and adopt a resolution to move forward with the Project and selected Operator to complete the construction and development of the Project. If (1) the selected Operator is unable to produce satisfactory deliverables, including a desirable Project budget, or (2) the Board determines that the Project is not necessary based on the results of the scoping period, then the Board will begin a new scoping period with another Operator or cancel this RFPQ process. In either event, the resulting scoping period deliverables will be solely owned by the Board, and the Board may use the information from the scoping period deliverables for its future use and benefit. The Board will not reimburse the Operator for work completed during the scoping period.
Post-Bid
Playgrounds / Parks / Athletic Fields
$900,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 24, 2025
January 26, 2026
To Be Determined, Maringouin, LA
Related To This Project
Maringouin, LA
--
Maringouin, LA
Bid Date: Dec 04 2025
Maringouin, LA
Bid Date: Dec 18 2025
Maringouin, LA
Bid Date: Dec 23 2025
Maringouin, LA
--
Maringouin, LA
--
Maringouin, LA
Bid Date: Mar 11 2026
Maringouin, LA
Bid Date: Dec 10 2025
Maringouin, LA
Bid Date: Oct 15 2025
Maringouin, LA
Bid Date: Aug 28 2025
Maringouin, LA
Bid Date: Aug 15 2025
Maringouin, LA
Bid Date: Sep 02 2025
Maringouin, LA
Bid Date: Jul 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.