Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Site work and paving for a mixed-use development in Congress, Arizona. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.
093 YV 156 F063801C 093-B-(226)T WICKENBURG-KINGMAN HWY (US-93) (Placeritas Crk to Date Crk) The project is located in Yavapai County on US 93 between MP 156.0 and MP 172.0. The proposed work consists of pavement rehabilitation. The work includes milling and filling the existing asphaltic concrete of roadway mainline and shoulders, and milled asphalt concrete treatment at designated unpaved crossovers. The work also includes replacing existing guardrail, embankment curb, drainage improvements, joint seal replacement, seeding, applying pavement marking, installing ground-in rumble strips, delineator, and object marker updates, and other related work. The time allowed for the completion of the work included in the contract will be 305 working days. NorthWest District Item # 103681 Engineering Specialist: Yusuf Kadem Question Deadline 11/04/2025 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The time allowed for the completion of the work included in this contract will be 240 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 3.64. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - Pavement Rehabilitation - US 93
Award
Roads / Highways
$19,479,342.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2025
January 6, 2026
US-93, Congress, AZ
Related To This Project
Congress, AZ
--
Congress, AZ
--
Congress, AZ
Bid Date: Apr 18 2025
Congress, AZ
--
Congress, AZ
--
Congress, AZ
Bid Date: Jul 08 2022
Congress, AZ
Bid Date: May 06 2022
Congress, AZ
Bid Date: Apr 15 2022
Congress, AZ
Bid Date: Dec 16 2022
Gilbert, AZ
--
Phoenix, AZ
Bid Date: Sep 16 2025
Chandler, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
