BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Site work, paving and outdoor lighting for a civil project in Yuma, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and for outdoor lighting for a road / highway.

095 YU 043 F083201C 095-B-(221)T SAN LUIS-YUMA-QUARTZSITE HWY (US 95) (Imperial Dam and Aberdeen Rd I) PROJECT NO. 095 YU 043 F0832 01C, 095-B(221)T The proposed project is located in Yuma County on US 95 from mileposts 43.4 and 55.0, approximately 17 miles northeast of the City of Yuma and approximately 60 miles south of Interstate 10 (I-10). The work consists of constructing roundabout intersections at the Imperial Dam Road and Aberdeen Road intersections. The roadway will be widened from the existing 2-lane undivided roadway to a 4-lane roadway at the roundabout intersection. After the roundabout the roadway will transition back to the existing two-lane roadway. The work includes grading, paving, installing new pipe culverts, intersection lighting, erosion control, seeding, signing, striping, fencing and other related work. The time allowed for the completion of the work included in this contract will be 380 working days. SouthWest District Item # 105126 Engineering Specialist: Jesmin Farhana Question Deadline 10/14/2025 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 7.36. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - Intersection Improvements - US 95

Award

Roads / Highways

$24,676,768.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

296

10

6

9

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
12
Bidding Soon
141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2025

December 30, 2025

Project location map

US-95, Yuma, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.