Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Renovation of a mixed-use development in Newport Beach, California. Completed plans call for the renovation of a fire / police facility.

The work necessary for the completion of this contract consists of removing and disposing of the existing roofing systems, installing new built-up roof systems, and all other work as specified in the contract documents at the following locations: 1. Mariners Library (1300 Irvine Avenue) 2. Fire Station No. 7 (20401 SW Acacia Street). Online Q&A Yes Q&A Deadline 09/18/2025 1:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $500.00 Per Day Project Duration 80 Consecutive Working Days License Requirements C-39

Award

Library

$423,400.00

Public - City

Renovation

14

14

14

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
675
Active Projects
269
Bidding Soon
4,730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

October 27, 2025

Project location map

Multiple Locations, Newport Beach, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed