Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work for a water / sewer project in Newport Beach, California. Completed plans call for site work for a water / sewer project.

License Requirements A Liquidated Damages $1,000 Per Day Engineers Estimate $9,500,000 Project Duration 400 Consecutive Working Days Question Deadline 08/04/2025 at 10:00 AM PT Online Q&A Yes If there is a conflict or discrepancy between different Contract Documents, the more stringent requirement as determined by the Engineer shall control. The work necessary for the completion of this contract consists of: Balboa Peninsula: o Installing temporary high-line during construction o Removal of existing 14-inch and 16-inch diameter cement-mortar lined cast iron pipes and 8-inch PVC pipes o Abandonment of existing 14-inch diameter asbestos cement pipes and 16-inch diameter ductile iron pipes around Fire Department/Library buildings o Construction of new 8-inch diameter C900 PVC distribution main o Construction of new 8-inch resilient wedge gate valves o Construction of new fire hydrants and water services o Construction of new service lines for connections to existing DCDA backflow devices o Construction of 16-inch and 14-inch in-line valves (as needed) for system shutdown o Connections to existing distribution system o Pavement Rehabilitation (AC and PCC) o Replacement of concrete alley approach and residential driveway approach East Irvine Terrace: o Abandonment of existing 6-inch diameter asbestos cement pipe o Construction of new 8-inch diameter PVC distribution main o Construction of new fire hydrants and water services o Construction of new 8-inch diameter resilient wedge gate valves o Construction of 6-inch in-line valves (as needed) for system shutdown o Connections to existing distribution system o Pavement Rehabilitation (AC) o Replacement of Concrete Cross Gutter, Curb and Gutter, and Sidewalk Shorecliff Community: o Abandonment of existing 6-inch and 8-inch diameter asbestos cement pipe o Construction of new 8-inch diameter PVC distribution main o Construction of new fire hydrants and water services o Construction of new 8-inch diameter resilient wedge gate valves o Construction of 8-inch in-line valves (as needed) for system shutdown o Connections to existing distribution system o Pavement Rehabilitation (AC) o Replacement of concrete cross gutter QA - 8/4/25: No DBE goals or requirements for this bid

Award

Water / Sewer

$6,741,473.00

Public - City

Site Work

25

12

2

6

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
637
Active Projects
316
Bidding Soon
3,547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

October 20, 2025

Project location map

Multiple Locations, Newport Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.