Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated August 29, 2025
Outdoor lighting and renovation of an elderly care / assisted living facility in Newport Beach, California. Completed plans call for the renovation of a elderly care / assisted living facility; and for outdoor lighting for a 43,232-square-foot, one-story above grade elderly care / assisted living facility.
Project Duration 50 Consecutive Working Days Demolition of the existing building to make way for a new Firemen's Training Facility, that includes a training tower, classroom building with apparatus bay, training props building, and a pump house on the site.the site. 2. Specific Items Included in the Works - all work indicated on Drawings and herein, specifically: a. Removal from the Job Site of all demolition debris and other materials indicated on the Drawings to be removed. b. Legal off-site disposal of all removed materials, as specified. c. Removal, stabilization, and repair, capping of existing underground utilities as indicated in the Drawings or necessitated by the performance of Work as specified. d. Included in the Works are all services, trucking, testing, storage, engineering, layout supervision, coordination, and all other operations, services or efforts required to perform the Work. e. Notwithstanding that Drawings and Specifications may be incomplete I n certain details, it is understood by the Contractor that any work not explicitly specified therein, but nonetheless required to comply with the agreed contractual intent of providing a complete job, shall be included in the Work. f. Contractor shall directly coordinate the underground services with public utility agencies for all requests for access to existing utility company equipment or shutdowns of active existing permanent services, with concurrent notification to Owner in writing in each case. g. Contractor shall be responsible for all public utility agency notifications, access requests and payment of any associated costs Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Cash, certified check or cashier's check (sum not less than 10 percent of the total bid price) may be received in lieu of the BIDDER'S BOND. The title of the project and the words "Sealed Bid" shall be clearly marked on the outside of the envelope containing the documents. Original copies must be submitted to the City Clerk's Office. Question Deadline 07/15/2025 at 2:00 PM PT online Q & A
Award
Elderly Care / Assisted Living
$526,450.00
Public - City
Outdoor Lighting, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
August 21, 2025
801 Narcissus Ave, Newport Beach, CA
Related To This Project
Newport Beach, CA
Bid Date: Jul 29 2025
Newport Beach, CA
Bid Date: Aug 13 2025
Newport Beach, CA
Bid Date: Aug 12 2025
Newport Beach, CA
Bid Date: Sep 03 2025
Newport Beach, CA
Bid Date: Sep 22 2025
Newport Beach, CA
Bid Date: Sep 10 2025
Newport Beach, CA
Bid Date: Sep 25 2025
Newport Beach, CA
Bid Date: Sep 24 2025
Newport Beach, CA
Bid Date: Jul 10 2025
Newport Beach, CA
Bid Date: Jul 03 2025
Newport Beach, CA
Bid Date: Jun 05 2025
Newport Beach, CA
--
Newport Beach, CA
Bid Date: May 28 2025
Newport Beach, CA
Bid Date: Jun 05 2025
Newport Beach, CA
Bid Date: May 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
