BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Outdoor lighting and renovation of an elderly care / assisted living facility in Newport Beach, California. Completed plans call for the renovation of a elderly care / assisted living facility; and for outdoor lighting for a 43,232-square-foot, one-story above grade elderly care / assisted living facility.

Project Duration 50 Consecutive Working Days Demolition of the existing building to make way for a new Firemen's Training Facility, that includes a training tower, classroom building with apparatus bay, training props building, and a pump house on the site.the site. 2. Specific Items Included in the Works - all work indicated on Drawings and herein, specifically: a. Removal from the Job Site of all demolition debris and other materials indicated on the Drawings to be removed. b. Legal off-site disposal of all removed materials, as specified. c. Removal, stabilization, and repair, capping of existing underground utilities as indicated in the Drawings or necessitated by the performance of Work as specified. d. Included in the Works are all services, trucking, testing, storage, engineering, layout supervision, coordination, and all other operations, services or efforts required to perform the Work. e. Notwithstanding that Drawings and Specifications may be incomplete I n certain details, it is understood by the Contractor that any work not explicitly specified therein, but nonetheless required to comply with the agreed contractual intent of providing a complete job, shall be included in the Work. f. Contractor shall directly coordinate the underground services with public utility agencies for all requests for access to existing utility company equipment or shutdowns of active existing permanent services, with concurrent notification to Owner in writing in each case. g. Contractor shall be responsible for all public utility agency notifications, access requests and payment of any associated costs Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Cash, certified check or cashier's check (sum not less than 10 percent of the total bid price) may be received in lieu of the BIDDER'S BOND. The title of the project and the words "Sealed Bid" shall be clearly marked on the outside of the envelope containing the documents. Original copies must be submitted to the City Clerk's Office. Question Deadline 07/15/2025 at 2:00 PM PT online Q & A

Award

Elderly Care / Assisted Living

$526,450.00

Public - City

Outdoor Lighting, Renovation

20

17

19

7

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
360
Bidding Soon
3,507
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

August 21, 2025

Project location map

801 Narcissus Ave, Newport Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.