BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 1, 2025 at 8:00 PM

Updated October 2, 2025

Renovation of a municipal facility in Greenville, Kentucky. Completed plans call for the renovation of a municipal facility.

The project consists of installing new PVC roofing membrane over existing metal roof including the following: 1. Demolition: a. Remove existing PV panels. b. Remove obsolete curbs. c. Remove existing gutters and downspouts d. Remove existing roof edge metal trim. e. Disposal of demolition waste materials. 2. New Construction: a. Install new roofing panels to infill: i. Openings where obsolete curbs were located. 3. Roofing Installation: a. Install flute filler insulation between ribs of the metal roof panels. b. Lay approved cover board over the insulation and ribs, and then mechanically fasten to deck. c. Lay single ply membrane into place. d. Mechanically fasten membrane. e. Hot air weld field seams and laps. f. Custom flash penetrations then treat with a hot air welder. g. Install new sheet metal edge flashing, trim, gutters and downspouts, etc. All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered.

Award

Municipal

$301,933.00

Public - State/Provincial

Renovation

8

13

2

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
88
Bidding Soon
1,045
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

September 30, 2025

Project location map

St-1000-10, Greenville, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.