Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2025 at 8:00 PM
Updated October 17, 2025
Site work and paving for a road / highway in Bloomington, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
This project shall include, but is not limited to, the cost to furnish complete asphalt paving, all materials, milling, paving and compaction equipment, labor, supervision, trucking, and pavement markings. a cashier's check or certified check drawn on an acceptable bank or a Bid bond equal to five (5) percent of the total amount of bid for a public works project estimated to cost at least $200,000 For projects utilizing Federal funding, wage rates shall be in compliance with the Davis Bacon Act. For Bids of $200,000.00 or more, the successful Bidder shall furnish both a performance bond and a payment bond for one hundred percent (100%) of the contract amount prior to the execution of the contract, and the performance bond and the payment bond shall remain in effect for a period of one (1) year after final acceptance of the work. Bidder shall examine each of the Contract Documents, visit the site of the work and thoroughly and fully inform themselves of the construction hazards, procedures, labor, conditions and factors, which could affect the prosecution and completion of the work. Such considerations shall include; the conditions of existing structures and facilities which may be affected by the proposed work, the procedure necessary for maintenance of uninterrupted operation of existing facilities, the availability and cost of labor and methods for transporting, handling, and storage of materials and equipment. All such factors shall be properly investigated and considered in the preparation of the Bidder's Bid. There will be no subsequent financial adjustment to any contract for lack of such prior information or its effects on the cost of the work. The Bid guarantee shall be made payable without condition to the City of Bloomington, Indiana, hereinafter referred to as "City", and the amount of said Bid Guarantee may be retained by and forfeited to the City as liquidated damages if the Bid covered thereby is accepted and a contract based thereon is awarded and the Bidder should fail to enter into a contract in the form prescribed, with legally responsible sureties, within fifteen (15) days after such award is made and confirmed by the City. Any and all obligations, duties, and responsibilities necessary to the successful completion of the Project assigned to, or undertaken by, the Contractor under the Contract Documents, including all labor, materials, equipment, and other incidentals, and the furnishing thereof. Question Deadline - 09/16/2025 at 3:00 PM ET - Should Bidders find discrepancies in, or omissions from, the Contract Documents, or should they be in doubt as to their meaning, questions should be submitted through the procurement portal at online. Interpretation of the proposed contract documents will be made only by addendum. A copy of each addendum will be posted on the online. The Board of Public Works reserves the right to waive any informality and to accept or reject any or all bids submitted. Bids may be held by the Board of Public Works for a period not-to-exceed sixty (60) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of the Bidders prior to awarding the contract. ALL PROJECTS - Mobile/Demobilization - Maintenance of Traffic - Milling, Asphalt, Variable Depth 0"-1.5" - Tack Coat - HMA Surface, 9.5mm, Type B - 1.5" - HMA, Base, 25mm - Casting, Inlet, Adjust to Grade - Casting, Water Valve, Adjust to Grade - Casting, All Manholes, Adjust to Grade - Pavement Markings installed to original layout o Line, Thermoplastic, Yellow, 4 IN o Transverse Marking, Thermoplastic, Crosswalk Line, White, 24 IN o Line, Thermoplastic, Solid, White, 4 IN - Parking Ts o Line, Thermoplastic, Solid, Blue, 4 IN - Parking Ts o Transverse Marking, Thermoplastic, Stop Line, 24 IN o Pavement Message Marking, Thermoplastic Lane Indication Arrow o Line, Thermoplastic, White, 4 IN o Line, Thermoplastic, Broken, White, 4 IN W 10thmStreet from N Walnut Street to N Morton Street A. Contractor to include all lanes curb to curb W 9th Street from N Walnut Street to N Morton Street A. Contractor to include all lanes curb to curb W 7th Street from B-Line to N Rogers Street A. Contractor to include all lanes curb to curb with exception of concrete parking areas W 6th Street from N Morton Street to N Rogers Street A. Contractor to include all lanes curb to curb S Madison Street from W 3rd Street to W 7th Street A. Contractor to include all lanes curb to curb B. Exception 4th Street intersection E 3rd Street from S Walnut Street to westside of S Dunn Street A. Contractor to include all lanes curb to curb E 3rd Street from East side of S Dunn Street to S Indiana Ave A. Contractor to include all lanes curb to curb W Kirkwood Ave from S Walnut Street to S College Ave A. Contractor to include all lanes curb to curb
Award
Roads / Highways
$600,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
October 23, 2025
Multiple Locations, Bloomington, IN
Related To This Project
Bloomington, IN
Bid Date: Oct 20 2025
Bloomington, IN
Bid Date: Oct 01 2025
Bloomington, IN
Bid Date: Sep 25 2025
Bloomington, IN
Bid Date: Oct 08 2025
Bloomington, IN
Bid Date: Oct 08 2025
Bloomington, IN
Bid Date: Sep 15 2025
Bloomington, IN
Bid Date: Oct 08 2025
Bloomington, IN
--
Bloomington, IN
Bid Date: Sep 18 2025
Bloomington, IN
Bid Date: Oct 14 2025
Bloomington, IN
Bid Date: Sep 19 2025
Bloomington, IN
Bid Date: Sep 22 2025
IU BL572 Intercollegiate Athletics Gymnasium Replace Chiller, Heating Systems and Controls - 5874310
Bloomington, IN
Bid Date: Feb 05 2026
Bloomington, IN
Bid Date: Sep 10 2025
Bloomington, IN
Bid Date: Aug 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.