Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Site work and new construction of a municipal facility in Louisville, Kentucky. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Kentucky Trails is a major expansion of The Louisville Zoo. The project will be constructed on over seventeen acres of undeveloped zoo property. The site is located between Beargrass Creek, the Kensington Neighborhood, and the Zoo path adjacent to existing features such as Australian Outback, Wild Burger, Snow Leopard and Tiger Taiga. The project consists of several new structures, multiple animal habitats, a man-made creek for kayaking, and a new train ride experience. Question Deadline 10/03/2025 at 3:00 PM ET Online Portal If you have any technical questions related to your submission, please contact Bonfire at Support@GoBonfire.com. o 15% for certified minority owned businesses o 5% for certified female owned businesses; and o 0.5% for certified handicapped owned businesses. Proposals cannot be submitted through the portal after 3:00 p.m. EST on October 10th, 2025 The first phase of construction will enable the subsequent phases to come online with minimal disruption to the infrastructure and visitor experience. Phase 1 will include alternates. The base scope of this phase is tree and brush removal, demolition of abandoned fencing, installation of sediment basins and silt fence, and construction fencing. Alternate 1 is to include demo and rework of existing sewer lines. Alternate 2 is to include construction of new utility trunks and the man-made creek and wetlands along with piping and infrastructure required for LSS in a future phase. Graded surfaces that will be paved in future construction phases will be utilized as pervious surface walking trails at the completion of Phase 1 and throughout construction of subsequent phases. If Alternates 1 and 2 are not done in Phase 1, they will need to be done in Phase 1B, which could precede or overlap Phase 2. The second phase of construction includes the completion of the following components in sequence to be determined in the pre-construction meetings. - KT Plaza, Guest Services Building, Kayak Launch, Train Rails, Station and Maintenance Building - Beaver and Otter Holding Building, LSS System, Sandhill Crane and Habitats - KCC Building, Training Yard, KCC Plaza, Raptor Holding and MOTUS Tower - Predator Holding Building, Critter Corridor and Habitats - Bison and Elk Holding, Habitats, View Shelters, Raised Boardwalk, Rickhouse Pavilion and Plaza

Award

Municipal

$10,000,000.00

Public - City

New Construction, Site Work

602

5

4

8

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
86
Bidding Soon
1,653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

December 22, 2025

Project location map

1100 Trevilian Way, Louisville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.