Published November 3, 2025 at 7:00 PM

Updated November 4, 2025

Site work for a water / sewer project in Loveland, Colorado. Completed plans call for site work for a water / sewer project.

As of October 31, 2025, this project has not yet been awarded. A timeline for award has not yet been established. Reference Number 0000397638 Bid Intent Not Available Purchase Type One Time Only- Delivery Date:04/01/2026 East Larimer County Water District (ELCO) completed a final design of a concrete meter vault for connection to the recently installed North Weld County Water District and ELCO water transmission pipeline (NEWT III). Final for Construction (FFC) drawings and specifications (both attached) are included as part of the nine (9) Procurement Contract Documents (attached) that are based on 2019 Engineers Joint Contract Documents Committee (EJCDC) Procurement Series Documents. ELCO desires to have the meter vault precast and delivered to the defined Point of Destination (see attached EJCDC P-520, Agreement Between Buyer and Seller, attached). The vault would be hydrostatically tested and pre-assembled to the Engineer's design inclusive of penetration seals, damp proofing, painting, startup service and owner training, etc., and containing the following installed equipment (Refer to Equipment and Material List, Drawing C-101): Flowmeter; Cla-Val control valve; hatches; ladder with ladder up post; duct termination bank and predrilled penetrations for electrical conduits; fusion bonded epoxy coated ductile iron pipe spools and fittings with dismantling joints; adjustable pipe supports; tapping saddle; ball and manifold valves; pressure gages; and pressure transmitters. ELCO will contract with electrical and instrumentation and control contractors for acquisition and installation of related equipment (control panel, battery and solar cabinets, intrusion and flood switches, antenna and solar array system with mast, etc.). ELCO will provide offload from flatbed (unless otherwise proposed), excavation, installation of vault, backfill, concrete pads, and other ancillary efforts including permitting. Alternative Material: As an alternative to precast concrete, Bidders may propose steel as a substitute material, provided other design requirements and equipment inclusions are met as described above and within the Procurement Contract Documents. Provide drawing(s) and necessary specifications, identify any deviations from Procurement Contract Documents, and submit other supporting information so Buyer can conduct proper review. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - FOB Destination - FOB Pre-Paid - Insurance Required - Training Required - Warranty Information Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % Question Deadline 09/24/2025 at 12:00 PM MT Questions are submitted online Yes, All questions about the meaning or intent of the Procurement Bidding Documents are to be submitted to Buyer via email to: Dave K. Myer, P.E. Distribution System Engineer East Larimer County Water District (ELCO) davem@elcowater.org

Bid Results

Water / Sewer

$143,857.00

Public - County

Site Work

24

31

2

6

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
3
Bidding Soon
965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

November 3, 2025

Project location map

Larimer County Rd, Loveland, CO

Fuel growth with access to the bidding project info your business needs.