Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 17, 2026

Renovation of an educational facility in College Station, Texas. Design plans call for the renovation of a educational facility.

The Texas A&M University System Office of Facilities Planning & Construction is soliciting proposals through the Competitive Sealed Proposal (CSP) process on behalf of Texas A&M University for the Fowler, Hughes and Schuhmacher Halls Plumbing Riser Replacement in College Station, Texas. This project will provide replacement of plumbing risers, exhaust ductwork, and associated restroom renovations across 157 restrooms in three multi-story residence halls. *Previous solicitation listed below for reference:* The Texas A&M University System Office of Facilities Planning & Construction (FP&C) on behalf of the Board of Regents of The Texas A&M University System (Owner) and Texas A&M University are soliciting statements of qualifications for selection of an Architect/Engineer (A/E) firm for the Fowler, Hughes and Schuhmacher Halls Plumbing Riser Replacement project (#02-3466) for Texas A&M University in College Station, Texas, in accordance with the terms, conditions, and requirements set forth in this Request for Qualifications (RFQ). The Fowler, Hughes and Schuhmacher Halls Plumbing Riser Replacement consists of replacing the plumbing stack and mechanical ductwork in twenty (total) CMU mechanical chases in Fowler (9), Hughes (6), and Schuhmacher (5) Hall's. The work will require CMU block wall demolition at restrooms, including the showers and the toilets adjacent to the chase of approximately 157 restrooms. Verification of the total number of restrooms affected and ADA updates required by the work will be performed by the Architect/Engineer during the design phase. Plumbing work will consist of removing and replacing the sanitary waste and vent piping system serving the lavatories in each dorm room, shower drains, floor drains and water closets from the main in the basement to the fourth floor in each chase. Water supply and return lines will be modified as necessary to connect to the new shower fixtures and water closets. Mechanical work will consist of removing and replacing the exhaust duct work system from the first floor to and including the exhaust fan on the roof. The new duct work will be a ceiling exhaust and include fire dampers. Architectural work will include building back 2-hour fire rated walls at the chase, showers with shower pans, wall surrounds, toilet accessories, floor drains, tile floors, walls, suspended sheetrock ceilings and timed radiant heat panels. Fire sprinkler piping will be modified as necessary to accommodate new mechanical, plumbing, and architectural layouts. This RFQ is the first step in the process for selecting an A/E firm. The RFQ provides the information necessary to prepare and submit Qualifications for consideration by the Owner. The Owner may select three (3) or more of the top qualified Respondents to present their qualifications during an interview. Any questions regarding this RFQ shall be directed to: David Wilkinson The Texas A&M University System Office of Facilities Planning & Construction Phone: (979) 458-7043 E-mail: dwilkinson@tamus.edu The method of Contractor Selection has not been Determined at this time.

Design

Educational

$10,700,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
470
Active Projects
233
Bidding Soon
4,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2026

May 3, 2027

Project location map

To Be Determined, College Station, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed