Published October 6, 2025 at 8:00 PM

Updated October 7, 2025

Demolition, site work and addition to a mixed-use development in McAlester, Oklahoma. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

ALL BID PACKAGES BIDDING: 1. Earthwork, Storm Sewer, and Site Demolition 2. Select Demolition 3. Concrete Turnkey 4. Masonry 5. Structural and Miscellaneous Steel Fabrication and Erection 6. Millwork 7. Rough Carpentry 8. Joint Sealants, Waterproofing, & Fluid Applied Vapor Barrier 9. Coiling Storm Doors 10. Retrofit Roofing System and Sheet Metal, Flashings and Trims 11. Drywall Assemblies, Acoustical Ceilings, and Insulation 12. Aluminum Storefronts, Entrances, Windows, and Glazing 13. Finish Hardware, HM Doors, and Frames 14. Division 8 and 10 Installation Only 15. Flooring 16. Painting 17. Specialties 18. Plumbing and Utilities 19. HVAC 20. Electrical Complete sets of the Drawings, Project. A cashiers check or bid bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder, for all bids over $50,000, or as otherwise applicable by State Law. Checks or surety bonds will be returned to unsuccessful bidders. No bidder may withdraw his bid for a period of thirty (30) days after the bid opening date. The owner reserves the right to reject any or all bids and waive any informality ect Manual, and other Bidding Documents may be examined without charge, or be procured by bidders from Williams Contracting, Inc.; BWA Architects; or may be viewed at the plan room listed below. Question Deadline 09/23/2025 Bid Result: Earthwork, Storm Sewer, and Site Demolition - Yocham Site Solutions - 1,28,762.00 Select Demolition - Ark Wrecking - 8,550.00 Concrete Turnkey - Drake Construction - 1,87,940.00 Masonry - Straight Up Masonry - 2,13,500.00 Structural & Misc. Steel Fab & Erect - Advantage Terrafab - 1,65,000.00 Millwork and Finish Carpentry - Muskogee Cabinet and Trim - 94,250.00 Rough Carpentry - Williams Contracting, Inc. - 16,975.00 Coiling Storm Doors - Burgess Company - 47,830.00 Retro-Fit Metal Roof System - Metal Roof Contractors - 2,87,200.00 Drywall Assemblies & Ceilings, & Insulation - Wiljo Interiors - 92,725.00 Aluminum Storefronts, Entrances, Windows, & Glazing - Miller Glass - 29,400.00 Finish Hardware HM Frames & Doors - Storm Doors - FTO Building Specialties - 62,628.00 Div. 8 & 10 Install - KM Davis Installations - 9,500.00 Flooring - Architectural Flooring - 47,471.00 Painting - BA Painting - 12,783.00 Specialties - FTO Building Specialties - 17,755.00 Plumbing & Utilities - Richmond Plumbing - 97,459.01 HVAC - Stone Electric - 1,65,000.00 Electrical - Stone Electric - 1,55,000.00

Bid Results

Educational

$1,839,728.00

Public - City

Addition, Demolition, Site Work

83

32

37

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
49
Bidding Soon
671
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

November 29, 2025

Project location map

20 SW 5th St, McAlester, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.