Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 11, 2025 at 8:00 PM
Updated October 4, 2025
This is a service / maintenance or supply contract in Libertyville, Illinois. Contact the soliciting agency for additional information.
The Central Lake County Joint Action Water Agency (herein, CLCJAWA) is seeking proposals for a Hybrid Renewable Energy Project located at 2100 Mallory Drive in Libertyville, Illinois. The scope of work includes a proposed project focusing on alternative energy sources (i.e. solar power and/or battery storage) that is located at our facility but is operated and maintained by others. The project will be funded by CLCJAWA and must have a maximum payback time of five years. The project should conform to the elements shown and described within the plans and specifications. Work is expected to be completed in 2026. The Contractor shall comply therewith and pay, and require every Subcontractor to pay, the prevailing rates of wages as established by the Illinois Department of Labor for each craft or type of work needed to execute the contract in accordance with 820 ILCS 130/.01 et seq. Contractor shall prominently post the current schedule of prevailing wages at the Contract site and shall notify immediately in writing all of its Subcontractors, of all changes in the schedule of prevailing wages. Any increases in costs to Contractor due to changes in the prevailing rate of wage during the terms of any contract shall be at the expense of Contractor and not at the expense of the Owner. Work is expected to be completed in 2026. Change orders shall, however, be computed using the prevailing wage rates applicable at the time the change order work is scheduled to be performed. Contractor shall be solely responsible to maintain accurate records as required by the prevailing wage statute and to obtain and furnish all such certified records as and where required by Statute and administrative regulation (including certified payroll). Contractor shall be solely liable for paying the difference between prevailing wages and any wages actually received by laborers, workmen and/or mechanics engaged in the Work and in every way defend and indemnify Owner against any claims arising under or related to the payment of wages in accordance with the Prevailing Wage Act. The Owner agrees to notify the Contractor or Subcontractor of the pendency of any such claim, demand, lien or suit. The Contractor is advised that the Department revises the prevailing wage rates and the Contractor/subcontractor has an obligation to check the Department's website for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website. CLCJAWA reserves the right to reject any or all bid proposals or to accept any bid proposal, which in its judgment, will be in the best interest of the public or to waive any informalities in bidding.
Post-Bid
Solar Power Generation
Public - City
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2025
November 3, 2025
2100 Mallory Dr, Libertyville, IL
Related To This Project
Libertyville, IL
Bid Date: Oct 16 2025
Libertyville, IL
Bid Date: Nov 07 2025
Libertyville, IL
Bid Date: Jan 16 2026
Libertyville, IL
Bid Date: Sep 10 2021
Libertyville, IL
Bid Date: Nov 29 2021
Libertyville, IL
Bid Date: Nov 09 2021
Libertyville, IL
Bid Date: Nov 29 2021
Libertyville, IL
Bid Date: Nov 29 2021
Libertyville, IL
Bid Date: Oct 14 2025
Libertyville, IL
Bid Date: Oct 31 2025
Libertyville, IL
Bid Date: Sep 15 2025
Libertyville, IL
Bid Date: Sep 25 2025
Libertyville, IL
Bid Date: Sep 19 2025
Libertyville, IL
Bid Date: Sep 09 2025
Libertyville, IL
Bid Date: Sep 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
