BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Demolition and site work for a mixed-use development in Houston, Texas. Completed plans call for the demolition of a military facility; and for site work for a military facility.

Question Deadline 09/15/2025 at 9:00 AM CT All questions must be submitted no later than, to both the Contract Specialist and the Contracting Officer email addresses : buddy.ciemiengo.1@us.af.mil, shawn.stewart.4@us.af.mil. E-mail is the preferred method for questions. Requests shall be marked with solicitation number W50S77-25-Q-0015. The contractor shall furnish all plant, labor, tools, equipment, parts, supplies, and transportation necessary to perform RC26 Shelter Demo services at the 147th Attack Wing, Texas Air National Guard. The work must be carried out in accordance with the Performance Work Statement (PWS). This requirement is set aside exclusively for small businesses under NAICS code 238910, with a small business size standard of $19 million. The contract will be awarded as a Firm-Fixed-Price type and is expected to begin within 90 days after the notice of award.\The Contractor shall provide all labor, materials, equipment, supervision, and transportation necessary to demolish and remove the existing steel pavilion structure measuring approximately 65ft L x 80ftW x 25ft H (contractor to verify field). Work includes full removal of all structural components and the restoration of the site to a safe and clean condition. 2. SERVICES SUMMARY. The Contractor shall: 2.1 Demolition o Safely dismantle and remove the existing steel pavilion structure (60'L x 80'W x 25'H). o Take proper precautions to avoid damage to surrounding structures, pavement, utilities, or landscaping. Any damage done to the existing pavement is the contractors' responsibility. o All demolition shall comply with OSHA and Air Force safety standards. 2.2 Removal & Disposal o All structural materials (steel columns, beams, fasteners, etc.) shall be removed from the site by the Contractor. o Materials shall be disposed of or recycled at an offsite facility in accordance with local, state, and federal regulations. o No debris or structural materials may be left onsite. 2.3 Site Restoration o All anchor bolt holes and other slab penetrations resulting from the structure removal shall be filled with epoxy. o Epoxy used must comply with the Air Force Whole Building Design Guide (WBDG) approved products list. o Contractor shall submit epoxy product data sheet and manufacturer approval for review and acceptance before use. 2.4 Equipment & Access o Contractor shall provide all necessary equipment, including crane(s), rigging, lifts, and hand tools required to complete the work. o Contractor is responsible for transporting and operating all equipment at the job site. Equipment shall be sufficient to lift loads and beams of existing structure. o Contractor is responsible for coordinating access, laydown area, and equipment staging with base/facility POC. 3. Submittals (By email) Prior to mobilization, the Contractor shall provide: o Safety plan and demolition methodology. o Epoxy product submittal for bolt hole repair. o Crane and rigging plan (FAA requires 90 days submission for review) o Equipment list. o Schedule of work. 4. Safety and Environmental Compliance o Contractor shall comply with all OSHA, AFOSH, and base-specific safety guidelines. o Erosion, dust, and noise control measures must be implemented as needed. o Any spills or environmental hazards must be reported immediately to the appropriate environmental office. Contractor to submit Environmental plan to the 147 Civil Engineering Squadron. 5. Quality Assurance o All work shall be inspected and approved by the Government Representative. o Final acceptance will be based on removal of all materials, proper epoxy patching, and a clean worksite. All work shall be iaw Whole Building Design guide and Air Force Specifications, and International Building Code (Current Version). 6. Points of Contact All hot work shall be notified by 147 CE and 147 Fire. No work shall commence without proper notification to 147 Civil Engineering Squadron

Post-Bid

Military

$80,000.00

Public - Federal

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
60
Bidding Soon
3,730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.