BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated November 6, 2025

Renovation of a residential development in Sharon, Massachusetts. Completed plans call for the renovation of a residential development.

Contractors for the Exterior Siding Replacement - Phase 2 at State Aided Development: Hixson Farms (667-1) in Sharon, Massachusetts, in accordance with the documents prepared by RGB ARCHITECTS. The Project consists of but not limited to: the removal and replacement of wood siding shakes with simulated wood siding. Installation of 2" insulated R-sheathing panel. All bidding Requests for Information (RFIs) shall be submitted online by 09/24/2025 at 5:00PM EDT for general bids. This Project is Being Electronically Bid and Hard Copy Bids Will Not Be Accepted. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the SHARON HOUSING AUTHORITY. A bid deposit is not required for Projects advertised under $50,000. General bidders must agree to contract with minority and women business enterprises as certified by the Supplier Diversity Office (SDO). The combined participation benchmark reserved for such enterprises shall not be less than 13% of the final contract price including accepted alternates. Request for waivers must be sent to EOHLC (Chad.Howard@mass.gov) 5 calendar days prior to the General Bid date. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities

Award

Residential Subdivision

$233,399.00

Public - City

Renovation

10

12

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
582
Active Projects
260
Bidding Soon
4,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

October 31, 2025

Project location map

18 Hixson Farm Rd, Sharon, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.