Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 26, 2025 at 8:00 PM
Updated October 9, 2025
Renovation of an educational facility in Wellesley Hills, Massachusetts. Completed plans call for the renovation of a educational facility.
Fire Pump Replacement Add Alternate 1: Furnish and install new Soft Start Controller General Bids will only be considered from bidders holding a Certification of Eligibility from the Division of Capital Management and Maintenance in the category of "Fire Protection" and in a single project amount higher than the amount of the bid. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Deadline for Written Questions (General) Wednesday, October 1, 2025, 12:00 PM - All questions to be forwarded to the Purchasing Department by e-mail (no questions may be submitted by fax or telephone). E-mail: Bids@massbay.edu Contract Awarding Week of October 13, 2025 Onsite Construction Start Date December 1, 2025 Contract Completion Date May 1, 2026 Work included in the Fire Pump Replacement: a. Fire Protection work shall include: 1) Base Bid a) Disconnection and removal of existing fire pump. b) New electric fire pump. c) New concrete pad for fire pump. d) Disconnection and removal of old/corroded piping and valves. e) Installation of new piping and valves associated with the new fire pump. b. Electrical work shall include: 1) Base Bid a) Disconnection and removal of existing fire pump connection from controller. b) New Fire pump feeder from existing fire pump controller. c) Installation of new fire alarm tamper switches associated with new fire pump. 2) Add Alternate #1 a) Disconnection of existing fire pump controller and reconnection of new fire pump controller. b) New Fire pump feeder from new fire pump controller. c) Connection of new fire pump controller to existing fire alarm system. 3. Factory startup and commissioning of new heating systems and applicable controls. 4. Contractor shall final clean each work area upon completion and acceptance to the standards and specifications of MassBay Community College. 5. All work shall be installed in strict conformance with all applicable code requirements and manufacturer's written installation instructions. 6. The General Contractor shall furnish and do everything, except as otherwise provided by specific notations herein or on the drawings, necessary to complete the work in accordance with the Plans and Project Manual. He shall furnish all plant, labor, materials, supplies, tools, water, machinery, implements, light, power, transportation, and other facilities required, and do all work necessary for the complete execution and completion of the Contract, except that work or materials specifically stated to be done or furnished by others. 7. All work and materials furnished and installed shall be of the best quality and workmanship, and to the satisfaction of the Engineer. There shall be no defect in the work or the operation thereof due to inferior materials or the workman like placing of any part. The work under this contract shall be performed at such times as may be necessary to facilitate the orderly progress of the work. It is the intention of these Specifications and Plans to cover all work necessary and incidental to the completion of this project, including all trades, as shown on the drawings or specified. 8. Contractor shall do all necessary cutting and patching of structural and finish work as necessary to provide the finished results shown on the Contract Drawings and as herein specified. All cutting in occupied areas shall be performed during non-occupied periods.
Post-Bid
Educational
$505,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2025
December 1, 2025
50 Oakland St, Wellesley Hills, MA
Related To This Project
Wellesley Hills, MA
Bid Date: Sep 16 2025
Wellesley Hills, MA
Bid Date: Oct 02 2025
Wellesley Hills, MA
Bid Date: Dec 10 2025
Wellesley Hills, MA
Bid Date: Oct 09 2025
Wellesley Hills, MA
--
Wellesley Hills, MA
Bid Date: Oct 30 2025
Wellesley Hills, MA
Bid Date: Nov 05 2025
Wellesley Hills, MA
Bid Date: Nov 06 2025
Wellesley Hills, MA
Bid Date: Oct 01 2025
Wellesley Hills, MA
Bid Date: Oct 08 2025
Wellesley Hills, MA
Bid Date: Oct 01 2025
Wellesley Hills, MA
Bid Date: Aug 26 2025
Wellesley Hills, MA
Bid Date: Aug 19 2025
Wellesley Hills, MA
Bid Date: Jul 16 2025
Wellesley Hills, MA
Bid Date: Jun 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
