BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2025 at 8:00 PM

Updated October 26, 2025

Demolition, site work, paving and new construction of a civil project in Forkston Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Description and Location of the Project Are as Follows: This Work is the Furnishing and Installation of a Beam Bearing Slab Structure on Grs and a Prestressed Concrete Box Beam 48 X 21 Over a Tributary to Lick Run, Tree Removal and Other Miscellaneous Construction at a Department Prepared Site, as Indicated on the Approved Drawings Included in the Bid Package for State Route 4020, Section 014, in Sullivan County, Cherry Township From Approximately 0.1 Mile Northwest of Intersection With Harney Road (T466) to Approximately 0.8 Miles Southeast of the Intersection With Sayman Road (T464) and This Also Includes Tree Clearing on State Route 4010, Section 012, in Sullivan County, Hillsgrove Township From Approximately 338 Feet Northwest of Intersection With Sr 87 at Segment 0070 Offset 1964 to Approximately 0.1 Mile East of the Intersection With Sadie Lane at Segment 0070 Offset 0844. Project Cost Range: $100,000.00 - $199,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 79.00% Pre-bid Meeting: None Anticipated Ntp: 11/24/2025 Wage Rates: Yes Required Completion: 06/26/2026 Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PA DOT - SR 1029 Over Pond Hill Run *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$193,428.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

54

7

4

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
109
Bidding Soon
1,361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2025

November 24, 2025

Project location map

Sr4020, Forkston Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.