Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2026 at 7:00 PM

Updated November 9, 2026

Demolition, site work, paving and new construction of a civil project in Forkston Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The SR 1030 Section P62 project includes the replacement of the existing structure carrying SR 1030 over Harveys Creek in Lake Township, Luzerne County. The existing structure consists of a combination stone masonry deck arch at the downstream end and a reinforced concrete slab at the upstream end. The structure will be replaced with a single-cell precast concrete box culvert with pre-cast end sections. Approximately 350 linear feet of roadway between stations 102+50 and 106+00 will be realigned/reconstructed to improve sight distance and reduce curvature of the road approaching the SR 1030/SR 1053 intersection. The proposed structure will be approximately 39'-7" wider than existing (76' total) to accommodate the road realignment/reconstruction. A total of 0.195 acre of right-of-way strip takes and 0.171 acre of temporary construction easements will be required for the proposed project. Proposed work will be conducted under a 5.5-mile detour for the duration of construction (anticipated to be three months). Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 38.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - SR 1030 Over Harveys Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$2,500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
124
Bidding Soon
1,725
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2026

January 25, 2027

Project location map

State Rte 1030, Forkston Township, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed