Published March 4, 2021 at 7:00 PM
Updated September 15, 2023
Demolition, site work, paving and new construction of a bridge / tunnel in Forkston Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Replacement of a dry laid stone and metal pipe culvert with a precast reinforced concrete adjacent slab beam bridge on cast-in-place reinforced concrete abutments and wingwalls. The construction also includes removal of the existing culvert, removal and re-building of an existing dry laid stone channel wall, construction of a bituminous overlay over the bridge, installation of structure mounted guide rail, minor approach roadway work, and installation of approach guide rail. Kelly Road Culvert Replacement Project, which involves removal of the existing stone masonry and metal pipe culvert and constructing a precast concrete slab panel bridge on reinforced concrete abutments . Each BID must be accompanied by a Bid Bond payable to the Owner for ten percent (10%) of the total amount of the BID. As soon as the BID prices have been compared, the Owner will return the Bonds of all except the three lowest responsible bidders. When the Agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. Bidders must submit with their initial bid, a statement as to whether they have previously performed worksubject to the President's Executive Order No. 11246 (30 F.R. 12319-25) "Equal Opportunity Clause".The Bidder acknowledges that this bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1 - 167.11, which is incorporated herein by reference The Owner reserves the right to reject any or all bids, to waive any informalities in the bidding, or to limit the scope of work involved. No bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder. All Contractors must be PennDOT prequalified. All Contractors shall comply with all State and Federal laws prohibiting discrimination in hiring employment opportunities. Prevailing wage rates are required for this contract. Bidder hereby agrees to commence work under this contract within 10 calendar days of a date to be specified in the Notice to Proceed (anticipated NTP March 24, 2021) and to achieve contract completion by November 5, 2021
Award
Bridges / Tunnels
$393,450.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.