BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Site work and paving for a civil project in Forkston Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Safety Improvements Along Sr 0029 at the Intersection With Sr 3003 (Sugar Hollow Road) in Eaton Township, Wyoming County to Mitigate the Sight Distance and Turning Movement Safety Concerns for Traffic Traveling North on Sr 0029 Currently Poses for Motorists. Improvements Include Addition of a Northbound Left Turn Lane Along Sr 0029, Flashing Led intersection Ahead Signal Device, Paved Shoulders, Centerline and Edgeline Rumble Strips, Guide Rail Replacement, Safety Signing and Pavement Marking Upgrades, Closed System Drainage Improvements, Access Improvements, Slope Remediation Including Clearing and Grubbing for Sight Distance Improvements, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 29, Section 791, in Wyoming County, Eaton Township From Segment 0240 Offset 2807 to Segment 0250 Offset 2840. DBE (10%) Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-bid Meeting: None Anticipated Ntp: 03/17/2025 Wage Rates: Yes Required Completion: 12/02/2025 Prequalification Requirement: Yes State Type of Work: Miscellaneous Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 29/3003 Sugar Hollow *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$2,788,298.00

Public - State/Provincial

Paving, Site Work

113

9

70

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
123
Bidding Soon
1,364
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 17, 2025

Project location map

State Rte 3003 & PA-29, Forkston Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.