Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 21, 2025 at 7:00 PM

Updated December 20, 2025

Site work and paving for a road / highway in South Fork, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Department of Natural Resources (DNR) requests bids for the hauling approximately 5680 cubic yards of 3/4 " gravel with spreading and compacting the gravel at the approximate locations on the Project Map. Gravel to be supplied by DNR from the existing Price Creek Gravel Pit stockpiles (see Project Map for location) or supplied from another non-DNR source by contractor. A loader is NOT supplied to load the DNR stock piled material into trucks. Work includes contractor grading the existing road surface of the entire length of Skinner Creek Road. Skinner Creek Road is located in Rusk County. The Flambeau River State Forest owns just the 3.3 mile section between Hwy M and Rusk County Forest's portion of Skinner Creek Road at the "Leaving Flambeau River State Forest Sign". Road will be closed to traffic during project, contractor is responsible for signage. Haul 5,680 cubic yards of gravel, spread, and compact as directed by the DNR Property Contact at the approximate locations as shown on the Project Map. Grade the entire length of Skinner Creek Road 3.3 miles, which is entire project length. Specifications *POB intersection of Skinner Creek Rd and Hwy M A 0-.6 miles (2 inches) B .6-.8miles (4 inches) C .8-.9 miles (8 inches) corner D .9-2.3 miles (4 inches) 2.3 is Skinner Creek Bridge E 2.3-2.4 miles(4 inches) 2.4 is Our Lane F 2.4-2.6 miles (6 inches) corner G 2.6-2.7 miles (8 inches) area under tree canopy H 2.7-2.9 miles(4 inches) I 2.9-3.3 miles (6 inches) POE at Leaving Flambeau River State Forest sign 3.3 miles POB)-Point of Beginning(POE)-Point of End Bids are subject to DOA-3054 Standard Terms & Conditions. Bidders must fill out and submit DOA-3832 with their response. Questions concerning the certification process should be addressed to the Work Center Program, State Bureau of Procurement, 6th Floor, 101 E. Wilson St., Madison, Wisconsin 53702, (608) 266-2605

Post-Bid

Roads / Highways

$200,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
30
Bidding Soon
456
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

December 22, 2025

Project location map

Skinner Creek Rd, South Fork, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed