BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated October 23, 2025

Renovation of an educational facility in East Lansing, Michigan. Completed plans call for the renovation of a 12,500-square-foot educational facility.

Background: More than one in five students at MSU are first-generation students - a student whose parent or parents did not earn a bachelor's degree. The First Gen Center will be a dedicated space to support and recognize the distinct contributions of first-generation college students, but will be open to all students. While the needs of first-generation students align with needs of all students, they are often experienced with greater intensity. Evidence shows that intentionally designed shared spaces encourage meaningful engagement among students from diverse demographic and socioeconomic backgrounds. The cross-engagement is a key driver of student success, fostering a stronger sense of belonging, improving retention and contributing to both academic achievement and postgraduate outcomes. Acting now ensures MSU delivers on its mission of inclusive excellence and builds an equitable foundation for the next generation of Spartans Project Description: This project is anticipated to include approximately 12,500 square feet of renovation, 10,000 square feet in suite 150 and 2500 square feet in suite 2 at the Hannah Administration Building. The renovation is expected to include new offices, new open collaboration spaces, new conference rooms, new food service equipment, upgrades to existing HVAC equipment, both in the suites and possibly for the building systems, additional security system equipment, new electrical fixtures and controls, new flooring, new ceilings, breakrooms for staff, wellness rooms and single use restrooms. On completion, this project will support students successfully transitioning from being recent high school graduates to future college graduates. This project will not create or update any new spaces for the existing Registrar's Office staff that currently occupies suite 150. A separate project will be responsible for those accommodations. Michigan State University has retained The Collaborative to serve as the architect of record. The university is seeking a construction management partner for the project. The estimated total project cost of this project is between $4 Million and $7 Million dollars. For more information or questions on registration to bid, contact unifiersupport@msu.edu Anticipated Construction Start November 2026 Substantial Completion July 23, 2027 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$7,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
214
Bidding Soon
2,629
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2025

November 2, 2026

Project location map

426 Auditorium Rd, East Lansing, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.