BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2025 at 7:00 PM

Updated November 4, 2025

Renovation of an educational facility in Lansing, Michigan. Completed plans call for the renovation of a educational facility.

This project involves Project is located at 3535 Forest Road, Lansing, MI - Henry Executive Center. Room D10: Remove carpet, ceiling tiles, lighting fixtures, diffusers, cooling unit in D10A; sawcut and infill concrete slab for electrical floor boxes; install wall and closet door; install carpet tile flooring; provide outlets and data drops for work stations, behind monitors as needed and new floor boxes per Bid Set; remove existing floor boxes per bid set; and install LED lighting with controls and zones, plus additional work called out in Bid Set drawings. Room D14A: Remove flooring, ceilings, lighting fixtures, partial wall between D14 and D14A; construct metal stud wall to create conference room in D14A; install acoustical ceilings; install carpet tile flooring; paint walls; provide conference room; rework HVAC; provide outlets/data in new walls; and install LED lighting and controls. Plus additional work called out in Bid Set drawings. Suite D14: Replace flooring; replace ceilings; frame in wall per plan to create new conference room, provide power per Bid Set, and install LED lighting. Plus, additional work per bid set drawings. Add alternate pricing for new carpet, base, and wall paint in suite D20. The substantial construction completion date for the project, as set forth in the project manual and drawings is March 13, 2026. See applicable start date and interim completion dates in the General Requirements (Division One) - Part 1 Work Sequence section. Each proposal shall be accompanied by a bid security as set forth in the Instructions to Bidders. The Owner reserves the right to reject any or all proposals either in whole or in part and to waive any irregularities. Withdrawal of any proposal is prohibited for a period of 120 days after the actual date of the opening thereof. Performance and Labor and Material Bonds are required as set forth in the Instructions to Bidders. All prospective Bidders, their Subcontractors and suppliers must be awardable by and in compliance with the directives and guidelines of the Contract Compliance Division of the Michigan Civil Rights Commission. Question Deadline 10/01/2025 Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to be received by the Architect at least fourteen days prior to the date for receipt of Bids.

Bid Results

Educational

$207,700.00

Public - State/Provincial

Renovation

14

7

4

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
128
Bidding Soon
2,392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

November 17, 2025

Project location map

3535 Forest Rd, Lansing, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.