BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Renovation of a water / sewer project in Beaumont, Texas. Completed plans call for the renovation of a water / sewer project.

Question Deadline 09/26/2025 at 5:00 PM CT Please direct all questions to the Project Manager Mr. Garcia at sesar.garcia@beaumonttexas.gov or by phone at 409-785-3006. The Contractor will perform the pipe coating tasks as following noted and in accordance with the details provided in the Contract documents or as directed by the Engineer on: CATTAIL MARSH WETLAND 72-INCH OUTFALL PIPE COATING. _ The work generally includes: 1. Provide a construction schedule to facilitate scheduling of work to be performed by the OWNER and others. The CONTRACTOR will be required to submit for the Engineer's approval a construction sequence of the phased installation for the proposed work. 2. The project includes blasting and painting of the entire 72" diameter Wetland Outfall pipe, approximately 644 linear feet, as shown on the project plans and described in this specification. Contractor shall verify all dimensions prior to submitting the bid. 3. Remove pipe hold-down straps prior to painting or blasting operations and reinstall them once the painted pipe is completely dry. Straps are intended as a preventative measure and should not be tightened against the pipe. 4. Provide protection/cover for the flow monitoring device/conduit, supports, or other structures that are not specified in the Contract documents. 5. Protection of existing Willow Marsh Bayou Waterway and the adjacent outfall channel by preventing blasting dust, coating materials, and debris from entering and/or contaminating the Willow Marsh Bayou waterway. Ensure the safety of personnel during operations for the pipe segment over Willow Marsh Bayou waterway and take necessary precautions. Ensure disposal of excess material is done in accordance with the Contract documents. Restore the site to original conditions or better. Ensure all painting and blasting operations are inspected by aNACE-certified inspector holding a Level 1 certification or higher to verify compliance with standards outlined in this contract. The inspection report included in the Appendix must be properly and completely filled out by the on-site Contractor employee or approved representative, with a current NACE Inspector Certification, and submitted to the engineer and project manager daily. 10. Provide proper facilities for access and inspection by 3rd Party Inspectors, Engineers, Suppliers, and representatives of Federal, State and local agencies, directly or indirectly involved with the project

Award

Water / Sewer

$258,356.00

Public - City

Renovation

7

18

6

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
96
Bidding Soon
1,722
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

November 3, 2025

Project location map

4233 Babe Zaharias Dr, Beaumont, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.