Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2025 at 8:00 PM
Updated October 11, 2025
This is a service / maintenance or supply contract in Weston, Connecticut. Contact the soliciting agency for additional information.
The Ravenwood water system is primarily one bedrock well with two backup rock wells located off Godfrey Road East. The main well is at a depth of 420 feet and was constructed by the pound method. The yield (1994) was 10 GPM after three days. Backup Well No. 1 is at a depth of 605 feet and was constructed by the rotary method. Well No. 2 is at a depth of 580 feet and was constructed by air percussion. Both wells have 100-foot casings. Estimated 48 hours yields (1975) were 10 GPM for Well No. 1 and 12 GPM for Well No. 2. Neither Well is producing at these rates at present. There is a chlorine treatment system that must be maintained; however, at the present time, chlorine treatment is not required. The wells pump into twin 10,000-gallon storage tanks (20,000 gallons total) that serve as the suction supply for the booster station. It is this tank that is supplied with trucked-in bulk water during peak demand periods in the absence of adequate supply for the wells. The booster station delivers water from the storage tank that serves the Ravenwood distribution system. The existing standby generator was installed in 1994. This generator is scheduled for replacement in the current budget year (July 1, 2025 - June 30, 2026). The Ravenwood distribution system is comprised of 8-inch ductile iron pipe which services 27 residences on Ravenwood Drive, Godfrey Road East, and Tubbs Spring Court. In addition, the Town dog pound, transfer station, and Weston Gun Club are provided service. Each resident is metered and a curb valve is available for premise shut-off. There is no fire protection. The Contractor will provide adequate levels of qualified, trained staff experienced in the operation of water supply, treatment and distribution systems to fulfill the scope of work described below. The Contractor shall designate the following personnel to provide required services: Water Systems Operator(s): Experienced, trained and certified for on-site operation, maintenance and repair of Town Water Systems such as system checks of the Water Systems' treatment facilities, pump stations, etc. Additional Water Systems Operator(s): Assignment as needed, for on-site operation and maintenance of Town Water Systems. Question Deadline 10/01/2025 Inquires can be made via e-mail to Larry Roberts, Public Works Director at lroberts@westonct.gov. The Town of Weston reserves the right to accept or reject any and all proposals and reserves the right to waive technicalities where such action best serves the interest of the Town.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 10, 2025
November 10, 2025
Multiple Locations, Weston, CT
Related To This Project
Weston, CT
Bid Date: Jun 23 2025
Weston, CT
Bid Date: Jun 20 2025
Weston, CT
--
Weston, CT
Bid Date: May 07 2025
Weston, CT
--
Weston, CT
Bid Date: Feb 14 2025
Weston, CT
--
Weston, CT
--
Weston, CT
Bid Date: Dec 03 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
