Published September 12, 2025 at 8:00 PM

Updated October 11, 2025

This is a service / maintenance or supply contract in Weston, Connecticut. Contact the soliciting agency for additional information.

The Ravenwood water system is primarily one bedrock well with two backup rock wells located off Godfrey Road East. The main well is at a depth of 420 feet and was constructed by the pound method. The yield (1994) was 10 GPM after three days. Backup Well No. 1 is at a depth of 605 feet and was constructed by the rotary method. Well No. 2 is at a depth of 580 feet and was constructed by air percussion. Both wells have 100-foot casings. Estimated 48 hours yields (1975) were 10 GPM for Well No. 1 and 12 GPM for Well No. 2. Neither Well is producing at these rates at present. There is a chlorine treatment system that must be maintained; however, at the present time, chlorine treatment is not required. The wells pump into twin 10,000-gallon storage tanks (20,000 gallons total) that serve as the suction supply for the booster station. It is this tank that is supplied with trucked-in bulk water during peak demand periods in the absence of adequate supply for the wells. The booster station delivers water from the storage tank that serves the Ravenwood distribution system. The existing standby generator was installed in 1994. This generator is scheduled for replacement in the current budget year (July 1, 2025 - June 30, 2026). The Ravenwood distribution system is comprised of 8-inch ductile iron pipe which services 27 residences on Ravenwood Drive, Godfrey Road East, and Tubbs Spring Court. In addition, the Town dog pound, transfer station, and Weston Gun Club are provided service. Each resident is metered and a curb valve is available for premise shut-off. There is no fire protection. The Contractor will provide adequate levels of qualified, trained staff experienced in the operation of water supply, treatment and distribution systems to fulfill the scope of work described below. The Contractor shall designate the following personnel to provide required services: Water Systems Operator(s): Experienced, trained and certified for on-site operation, maintenance and repair of Town Water Systems such as system checks of the Water Systems' treatment facilities, pump stations, etc. Additional Water Systems Operator(s): Assignment as needed, for on-site operation and maintenance of Town Water Systems. Question Deadline 10/01/2025 Inquires can be made via e-mail to Larry Roberts, Public Works Director at lroberts@westonct.gov. The Town of Weston reserves the right to accept or reject any and all proposals and reserves the right to waive technicalities where such action best serves the interest of the Town.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
853
Active Projects
316
Bidding Soon
6,967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.