BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2025 at 8:00 PM

Updated September 27, 2025

Site work and paving for a civil project in Portugal Cove-St Philips, Newfoundland. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Closing Time: 3:30 PM (NT) Question Deadline 09/17/2025 All enquiries are to be submitted in writing to the Contracting Authority at DFO.tenders-soumissions.MPO@dfo-mpo.gc.ca as well as to the address of the contracting authority Dina Al Eryani Email : DFO.tenders-soumissions.MPO@dfo-mpo.gc.ca CC : Dina.Al-Eryani@dfo-mpo.gc.ca The work covered consists of the supply of all labour, materials, and equipment required to reconstruct the approach to the west pier at St. Philip's, NL. The work will require reconstruction of a 18.3m long section of cribwork, raising and reconstructing the wharf slab of a 13.1m long section of cribwork, and constructing a 11.6m long section of stacked armour stone wall, all in accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract. In general, the work under this contract consists of, but will not necessarily be limited to, the following: o Site Work including mobilization, demobilization, excavation, demolition, hauling, and disposal offsite and onsite. o Sampling and testing of the treated wood in accordance with the "Treated Wood Waste Disposal" Guidance Document published by the Provincial Department of Municipal Affairs and Environment" to determine disposal requirements. o Any required survey to set location of new Work as indicated on the drawings. o Construction of timber cribwork with associated rock ballast, hardwood fendering, wheelguard and blocking, and ladders. o Reprofiling of existing timber cribwork. o Supply and placement of new quarried rock fill, Class "A" granular material. o Supply and placement of scour protection. o Construction of reinforced concrete wharf deck. o Supply and placement of new stacked armour stone wall o Supply and placement of new asphalt pavement. o Supply and installation of new guard rail The estimated contract period will be 5 month(s), with a proposed start date of 2025/10/20.

Post-Bid

Water / Sewer

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
212
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2025

October 20, 2025

Project location map

To Be Determined, Portugal Cove-St Philips, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.