BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 4, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Construction of the Water Supply Plant No. 1 Phase 2 to Serve Harris County Municipal Utility District No. 570D Friendswood Development Company on behalf of Harris County Municipal Utility District No. 570D reserves the right to reject any and all bids. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. Bid security in the form of bid bonds or cashiers check payable to Friendswood Development Company on behalf of Harris County Municipal Utility District No. 570D in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same Question Deadline 09/29/2025 All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. As necessary, interpretations or clarifications will be issued by Addenda mailed or delivered to all parties having received the Bidding Documents. Questions received less than three working days prior to the date for opening of Bids may not be answered. Verbal discussions and answers are not binding. Bid(5.0%), Performance(100%), Payment(100%), Maintenance(100%), Certified Check site work for plant site including grading, pipe supports, splash pads, transformer pad, and all required appurtenance yard piping with all valves and fittings, including excavation, backfill and bedding 320,000 gallon x 24'h bolted powder coated ground storage tank, including tank piping, foundation, vents, railing, ladders, splash pad, and all appurtenances 15,000 gallon hydropneumatic tank, including tank piping, foundation, and all appurtenances 50 hp non-overloading horizontal split case booster pump with minimum efficiency at 79% at 750 gpm and 150' tdh, including all appurtenances painting of above ground piping, including valves, meter, pipe supports, fittings and all appurtenances, complete in place hc project no. 2504290038 HCFCD PROJECT no. 2504290045

Post-Bid

Water / Sewer

$400,000.00

Public - County

Site Work

26

22

8

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
239
Bidding Soon
3,366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2025

November 1, 2025

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.