BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2025 at 8:00 PM

Updated October 25, 2025

Site work for a water / sewer project in Galesburg, Illinois. Completed plans call for site work for a water / sewer project.

City/County City of Galesburg Remove and Replace Aviation Fuel Tanks - Base Bid Proposes Installing Two (2), Double-walled, Horizontal, Ul 2085 Listed Above Ground Storage Tanks Consisting of a 10,000-gallon Avgas 100ll Dispensing Tank (Retail Sale at an Airport) and a 15,000-gallon Jet a Bulk Tank. Additive Alternate No. 1 Proposes Running Power From Existing Services to the Proposed Facilities. Additive Alternate No. 2 Proposes to Remove Two (2) 12,000-gallon Underground Glasteel Ii Tanks. All Interested Prime Contractors Are Strongly Urged to Attend a Pre-bid Conference Scheduled for Thursday, September 25, 2025, 11:00 Am at the Galesburg Municipal Airport. Base Bid 1 Lsum 10,000-gallon Avgas 100ll Dispensing Ast Installation 1 Lsum 10,000-gallon Avgas 100ll Ast Foundation & Barriers Installation 1 Lsum 10,000-gallon Avgas 100ll Ast Electrical & Communication Installation 1 Lsum 10,000-gallon Avgas 100ll Ast Light Pole Installation 1 Lsum 15,000-gallon Jet a Bulk Ast Installation 1 Lsum 15,000-gallon Jet a Ast Foundation, Access, & Barriers Installation 1 Lsum 15,000-gallon Jet a Ast Electrical & Communication Installation 1 Lsum 15,000-gallon Jet a Ast Light Pole Installation Additive Alternate 1 1 Lsum 100ll Avgas Fuel Facility Electrical Service Complete 1 Lsum Jet a Fuel Facility Electrical Service Complete Additive Alternate 2 1 Lsum Phase Ii Environmental Site Assessment 1 Lsum Removal of Two (2) 12,000-gallon Underground Storage Tanks Project Location: Galesburg Municipal Airport (GBG), Galesburg, IL Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Underground Storage Tanks Questions may be submitted until 5:00 PM, Friday, October 3, 2025, to Michael Dudas at mdudas@hanson-inc.com as a Microsoft Word document

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Site Work

18

7

2

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
78
Bidding Soon
1,099
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

December 16, 2025

Project location map

275 Lloyd Stearman Dr, Galesburg, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.