BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

Site work and new construction of an educational facility in Oregon City, Oregon. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Clackamas Community College Invites Proposals From Qualified and Experienced Licensed (Ccb) Contractors (Herein After, Responder, Proposer, Company, Firm, Provider, or Contractor) to Provide Construction Manager/general Contractor (CM /GC ) Services for a New Natural Resources Center of Excellence to Be Located on the Oregon City Campus (Oregon City, Oregon). The College reserves the right to reject any proposal not in compliance with all prescribed public procurement requirements, and to reject for good cause any or all proposals upon finding that it is in the public interest to do so. SCOPE OF WORK The goal of the new Natural Resources Center of Excellence (NRCE) project is to create an enhanced presence for a variety of programs on the east side of the campus. In 2023 the college developed a Concept Master Plan which was approved by the City in 2025. The plan addressed the East Campus Vocational Hub and the vision of several improvements to the eastern side of campus including the NRCE. Several concepts and options were developed during this process. The Master Plan envisioned a building of roughly 40,000 square feet. The college is partnering with OSU Extension Service to collaborate in the construction and operations of the new building as there is a desire to bring the Extension programs to the college campus. The construction cost is expected to be between $35 million and $40 million. The CM/GC Services are for the benefit of the College. Required services are anticipated to start in December of 2025 and will include collaboration and support of the design and construction process, the review of schematic design, design development, and construction documents, providing cost estimating, alternative design analysis, preparing construction estimates, developing schedules, construction phasing planning, bid package recommendations, quality control review, assisting the Architect in development of the contract documents, etc., and other assistance as identified in the RFP. This project will involve working and coordinating with the Campus Services, Wenaha Group (Program and Construction Services Project Manager), Opsis (Architect), faculty, and students. Question Deadline 09/25/2025 at 5:00 PM PT Questions that arise during preparation of the RFP shall be submitted in writing to Elizabeth Cole, Purchasing Agent Email: purchasing@clackamas.edu

Post-Bid

Educational

$40,000,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
47
Bidding Soon
1,061
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

September 1, 2026

Project location map

19600 Molalla Ave, Oregon City, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.