BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Renovation of a municipal facility in Oregon City, Oregon. Completed plans call for the renovation of a 5,000-square-foot, one-story above grade municipal facility.

Metro is inviting bids for Metro South Transfer Station Bay 2 Floor Repair for Waste Prevention and Environmental Services. Metro requires the services of a specialty floor coating contractor experienced in repairing deteriorated solid waste tipping floors. Approximately 5,000 square feet of the tipping floor in Bay 2 at Metro South Transfer Station requires resurfacing. In addition, approximately 420 square feet of concrete floor located in the garbage pit adjacent to two compactor chutes requires resurfacing and is included in the Scope of Work. For Questions or Additional Information, Contact: Name: Bids and Proposals Email: bidsandproposals@oregonmetro.gov Description of Work Metro requires the services of a specialty Floor coating contractor experienced in repairing deteriorated solid waste tipping Floors. Approximately 5,000 square feet of the tipping Floor in Bay 2 at Metro South Transfer Station requires resurfacing. In addition, approximately 420 square feet of concrete Floor located in the garbage pit adjacent to two compactor chutes requires resurfacing and is included in the Scope of Work. Contractor will prepare and resurface the damaged concrete tipping Lloor and pit Floor at the Metro South Station located at 2001 Washington Street, Oregon City, OR 97045. The Work shall be in accordance with the attached J.R. Miller and Associated ISSUE FOR BID (REV C) set of drawings and specification, dated August 4, 2025. The Metro South Station operates 363 days a year. Work conditions at Metro South Transfer Station require a high level of safety awareness, strict adherence to safety procedures, and scheduling of Work that does not disrupt the daily operations of the facilities. Scheduling Work at Metro’s transfer stations requires close coordination with a Metro Project Manager who will work with transfer station staff to determine the best days and times for contracted Work to be completed. Facility downtime critically impacts the region’s ability to process solid waste. Due to the location of the working areas on this project, the Work will need to be completed as quickly as possible and in a safe manner. Weekend, Holiday, and/or night work will most likely be necessary to minimize operational downtime at the transfer station.

Award

Municipal

$756,967.00

Public - County

Renovation

6

8

11

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
3
Bidding Soon
634
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

January 9, 2026

Project location map

2001 Washington St, Oregon City, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.